![Primrose Double Sided Awning Instructions Download Page 2](http://html1.mh-extra.com/html/primrose/double-sided-awning/double-sided-awning_instructions_1601997002.webp)
Contents
Assembling Double Sided Awning
Fig 1. Assemble and connect part 1 & 2
together using M10 x 40mm bolts. This
will form part of a leg (base for awning)
Repeat process to form the other leg.
Fig 2. Insert roller part 3 over the
top of the upright post (mid section no.4)
connect both parts together using
M8 x 60mm bolts Repeat same process
and connect the other side.
Fig 3. Two people will be required to
complete this step. Connect the mid
sections (no.4) with the upright legs,
(left/right) by using M8 x 50mm bolts.
Do not attempt to lift this unit onto legs
without assistance.
Fig 4. Connect the angle bar (no6. left
and right) onto the end of the front bar
part no.5. Repeat same process to
connect the opposite side.
Fig 5. To adjust the height / angle
arm (no.6) Loosen the screw part no.7,
use the winder to project the fabric
(adjustment bar part no.8 will move
accordingly) Once the height is set
tighten up screw, part no7.
Fig 6. Use screw M8 x 50mm bolt and
M8 x 35mm to install the slanted bars
on both sides. The awning is now
assembled and ready to use.
1.
2.
3.
4.
5.
6.
Primrose Awning Installation Instructions
2