Concrete engineering

Assembly instruction

®

Press on the Light-box.

You can drill different and individual
openings.

You can install the lamps.

Nail the Light-box on the formwork.

Mark the lamps with a line, because of
the O 195mm mineral fiberboard it‘s
easy to correct the differences.

Grout the ceiling.

2

2

2

1

1

1

Installation in cast-in-place concrete

Last part of the installation

Insert the steel strutting and ready to 
concrete.

Remove the magnet.

3

3

Telefon 

+49 8638 / 88 55 92 00

Telefax 

+49 8638 / 88 55 92 99

[email protected]

www.primo-gmbh.com

Primo GmbH
Gebrüder-Dickow-Str. 2
84478 Waldkraiburg

Stand 03/2017

Halogen free

650 °C

H

Product clip at:

www.primo-gmbh.com

Order-no.

Name

VPE

P713

Light-box XL190 without tunnel

12

P713M

Light-box XL190 without tunnel, with magnetic attachment

12

P714

Light-box XL190 with tunnel

8

P714M

Light-box XL190 with tunnel and magnetic attachment

8

P713B

Light-box XL190 pre-installed, big pack

144

P714B

Light-box XL190 pre-installed with tunnel, big pack

144

P733

Magnet 32 mm to fix on the formwork

10