Primo Water WARDEN-XR30 Manual Download Page 9

Right-iso view 

Scale 1:32 

Summary of Contents for WARDEN-XR30

Page 1: ......

Page 2: ...RIGHT SIDE VIEW 8 RIGHT ISO VIEW 9 TOP VIEW 10 SAFETY INFORMATION 11 THINGS TO CONSIDER 12 PRE INSTALLATION 13 INSTALLATION 14 EXHAUST DUCTING GENERAL INFORMATION 16 EXHAUST DUCTING HOT AIR ROASTERS A...

Page 3: ...oaster 1500 lb 680 38 kg Cyclone 300 lb 136 1 kg Full Batch Roast Time Approximately 15 minutes Hourly Output 227 95 lb hr 103 4 kg hr Roast Air Maximum 360 scfm Cooling Bin Air Maximum 1125 scfm Cycl...

Page 4: ...dimensions and component descriptions These drawings are valuable for familiarization with the Warden Xr30 roaster and for space and utility connection planning Dimensions and some details are subject...

Page 5: ...Frontview Scale 1 32...

Page 6: ...Leftside view Scale 1 32...

Page 7: ...Left iso view Scale 1 32...

Page 8: ...Rightside view Scale 1 32...

Page 9: ...Right iso view Scale 1 32...

Page 10: ...topview Scale 1 32 Roaster to Cyclone Connection Not Pictured Above...

Page 11: ...nguisher nearby easily accessible incase of fire Your local fire department will have information on which fire extinguishers should be used Fires may be caused from not cleaning the roaster or exhaus...

Page 12: ...olt cyclone from ground if applicable 1 Use forklift to pickup machine from the back make sure to tilt forklift back once the roaster is lifted up to avoid it sliding off or tipping the forklift 3 Pla...

Page 13: ...sired position for the cyclone to make moving it easier Use spacing requirements further down Remove bolts from cyclone legs Pick up cyclone using forklift in between the cyclone legs Wrap and protect...

Page 14: ...rimo roaster Local codes regulations and or laws must be followed when doing the gas installation for the machine Propane roasters must use propane only and are required to use a gas regulator Have a...

Page 15: ...v Cyclone ATTENTION When installing the cyclone to your roaster use a licensed contractor The cyclone uses 6 ducting too vent Consult your licensed contractor to ensure proper installation of duct wor...

Page 16: ...Ventilation Air Conditioning HVAC professional can assist Information the qualified professional will need such as the diameter of the exhaust ducting and the maximum exhaust air flow is located on pa...

Page 17: ...Roasters with or without cooling bin cyclone and without an Afterburner Ducting must be suitable for 500 F 260 C continuous 2 000 F 1 093 C for 30 minutes and comply with UL 1978 ULC SC662 Standard f...

Page 18: ...he buildup of residues that could cause fire 1 The exhaust air from loaders and destoners is about the same temperature as the ambient air in the room or operating area The regulatory requirements for...

Page 19: ...the drum switch to activate the LCD screen 4 Press the ON button located on the LCD screen to ignite the burners 5 Push temp 1 button on the LCD use keypad to set desired temperature 6 Push temp 2 but...

Page 20: ...rge gate to drop material into storage bin Be sure to close the discharge gate correctly before dropping the next batch of material into the cooler tray iv Misc Shut off 1 Open funnel slide gate and t...

Page 21: ...in beneath cyclone remove the bin by sliding it away from the front of the cyclone Be sure the chaff bin is below cyclone prior to operating machine 2 Open cooler tray access doors to vacuum out chaff...

Page 22: ...necessary clean and remove the accumulation prior to cleaning 5 Check blower motor fan and if necessary clean Annual Cleaning 1 Check all visible bolts screws and tighten replace if necessary 2 Have a...

Page 23: ...a Primo Roaster additional documentation will be provided It is important for customers to read these documents to ensure that the installation and operation phases are smooth and safe Please feel we...

Reviews: