Installing the BladeFrame BF200 Hardware
The BladeFrame BF200 is not supplied as a stand-alone unit; it
must be installed in the Fujitsu Siemens Computers
PRIMECENTER Rack or an EIA standard 19-inch (48.26 cm)
third-party rack, 36 inches (91.44 cm) deep, with a load capacity of
1000 lb. (450 kg). This section describes how to install the
BladeFrame BF200 in a rack, and includes the following topics:
•
•
•
CAUTION!
•
Please observe the safety precautions and references to rack
installation in the section
Important Notes
.
•
At least two people are needed to position the server in the
rack.
•
The rack may tip over if more than one unit is removed from
the rack at the same time.
Installing the
Side Rails
The BladeFrame BF200 is supplied with side rails that can be used
in a PRIMECENTER Rack or a standard third-party rack to support
the chassis.
Installing the Side Rails in the PRIMECENTER Rack
The BladeFrame BF200 is supplied with side rails that can be used
in a PRIMECENTER Rack to support the chassis.
Summary of Contents for BladeFrame BF200
Page 2: ......
Page 4: ......
Page 8: ...Initial Setup Guide cBlade ES vi...
Page 20: ...Initial Setup Guide cBlade ES 1 6 Release 5 0...
Page 78: ...Initial Setup Guide cBlade ES 4 14 Release 5 0...
Page 110: ...Initial Setup Guide cBlade ES 5 32 Release 5 0...