
18
Completed the installation supply electrical power and water to the condensation hood.
It will operate independently on reaching temperature, detected by the probe, of 60 ° C. The step
of stopping fume extraction takes place on reaching the temperature of 40 ° C.
The second speed of the suction motor is operated by the magnetic sensor front and comes into
function automatically when the door of the oven.
3. MAINTENANCE
Warning!!! – Before performing maintenance operations, cut off power with the appropriate switch
or pull out the plug.
Warning!!! – Any maintenance operation shall be performed by qualified personnel only. The
maintenance interventions may require removing the front or the rear cover. To remove the front
cover, unscrew the perimeter screws (see 2.1.1) paying attention not to damage the electric
wiring when lifting the cover.
You may also remove the rear cover unscrewing the perimeter screws and lifting completely the
cover, paying attention not to disconnect the electric wiring.
Warning!!! – When removing the panels, handle the cover with care and wear gloves to protect
your hands from possible cuts.
3.1 – Removing the air blade filters
. To disassemble the filters, seize them and scroll them up so that
they get unthreaded from the lower runner. The filter will be fully removed if you rotate slightly the
lower wall. Perform the opposite operation to re-assemble the filter.
3.2 -
Cleaning Nozzle
: You have access to the nozzle of condensation by removing the cover of
the condensation chamber (Figure 5) Cleaning should be done with products suitable for the
removal of limestone. The nozzle cleaning is performed annually or whenever you were to
recognize malfunctions.
3.3 - Replacing the solenoid valve.
The replacement of the solenoid is by removing its fastening screws (Figure 5) after removing the
connecting tube (part 4 of Figure 4 -Pag.7) act the circle of water.
3.4 - Replacing the electronic board
The replacement of the electronic board must be carried out following, in order, the steps:
A. Disconnect the hood from the power supply and tighten the supply tap water.
B. Remove the top cover (See 2.1.1 )
C. Disconnect the electronic board to be replaced.
D. Replace the card
E. Reassemble - Perform in a reversed the operation previously described
NOZZLE
ELECTROVALVE
Summary of Contents for CFE-11C
Page 7: ...7 2 1 4 Riposizionare e fissare con le viti il pannello di copertura superiore...
Page 24: ...24 2 1 4 Bringen Sie das obere Abdeckpaneel wieder an und befestigen Sie es mit den Schrauben...
Page 33: ...33 2 1 4 Remettre le panneau de couverture sup rieur et le fixer avec les vis...
Page 39: ...39...