background image

                                                       Model:PN-8830 

                     

 

Multi-Tyres simultaneous Inflation&N2P Feature   

Nitrogen Tyre Inflation System Operation Steps 

 

1. Set final target pressure using the + and - buttons. The LCD 

screen will show the target pressure.   

2. Connect air hose(s) to tire valve stem(s). 

3. Turn red valve handle to the “FILL” position.   

4. Press “FILL/PURGE” once for standard inflation or Push 

and hold “FILL/PURGE” for 2 seconds for nitrogen 

conversion.  

5. When unit “beeps” and the LCD screen flashes the target 

pressure, tire inflation is complete. 

6. Allow 15 seconds for the pressure in all tires to equalize, 

then turn red valve handle to the “STOP” position. 

7. Immediately remove hose(s). 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for PN-8830

Page 1: ...r hose s to tire valve stem s 3 Turn red valve handle to the FILL position 4 Press FILL PURGE once for standard inflation or Push and hold FILL PURGE for 2 seconds for nitrogen conversion 5 When unit...

Page 2: ...Specifications may vary for non standard equipment Contact your service agent for further information 1 3 Safety General The unit has standard process plant components and electrical equipment which...

Page 3: ...ge Hooks 4 Air Supply Caution Compressed air should be supplied to the unit with the air dried to a dew point temperature lower than the expected minimum ambient temperature Typical dew point from a p...

Page 4: ...WARNING To avoid the risk of personal injury especially to the eyes face and skin DO NOT direct the air stream at any person s CAUTION To avoid equipment damage never exceed the maximum inlet pressur...

Page 5: ...Increase final target pressure 3 Power Switch Turns unit on and off 4 FILL PURGE Inflation Deflation start 5 Fill Control Valve 6 Outlets For tire fill hoses 7 Compressed Air Inlet 8 Nitrogen Pressure...

Page 6: ...ting the hoses When topping off a single tire there is no need to wait for pressure equalization 7 Turn the Fill Control Valve handle to the STOP position 8 Immediately disconnect the tire fill hoses...

Page 7: ...ressure Check the supply pressure commences but does not complete ERROR CODES ER1 Unstable pressure faulty hose Replace the hose connector connector ER2 Persistent unstable pressure Replace the hose c...

Page 8: ...ion Error Unit requires calibration contact your local distributor or service agent ER9 Automatic Calibration Check Reset machine by Calibration Error switching off power for 5 seconds The ER9 message...

Page 9: ...to the filter head Do not over tighten Housing is sealed with an o ring so gently hand tighten 4 Repeat this process for both filters 8 2 Routine Maintenance Schedule Daily 1 Check for air and nitroge...

Reviews: