background image

Flush Channel Installation Guide

Summary of Contents for PARC Node

Page 1: ...Flush Channel Installation Guide...

Page 2: ...t Overview 2 Read and Save These Instructions 3 Before You Start 3 Tools Required 3 Site Conditions Storage and Handling Instructions 3 Flush Channel Installation Sequence 4 Access Cables 4 Connecting...

Page 3: ...rdinated with the manufacturer to the required sizes to match the building design The Node Flush Channel can be site cut if required The Node devices are supplied separately from the channel assemblie...

Page 4: ...be enclosed The Node Flush Channel should be kept clean dry and protected from the elements Site conditions should be prepared for installation of the Node Flush Channel The site should be clean dry...

Page 5: ...hole provided Before connecting the channel face to the mounting assembly connect the other end of the Node access cable to the flange on the inside of the channel face in the hole provided When lowe...

Page 6: ...ure a high quality joint between adjacent channel faces Figure 4 Figure 6 Figure 5 Connect all required sections ensuring no visible gap between both sections Finished installation should be as shown...

Page 7: ...ength this should be done at the end rather than a joint to minimize visual impact The maximum length that can be trimmed is defined by the position of the bridge bracket Node Device Installation Node...

Page 8: ...e Node removal tool anti clockwise until the Node device is released Figure 9 Waste Disposal Management PARC Node Channels are shipped and packaged with protective material that should be disposed of...

Reviews: