Recessed Channel Installation Guide

3

v001  |  Recessed Channel Installation Guide

Site Conditions, Storage and Handling  

•  Read the Installation Guide before handling.

•  Always wear appropriate hand protection when handling.

•  Only store in clean, dry conditions.

•  Do not over stack.

•  Do not stack in a way likely to cause falls.

It is the responsibility of the installer to ensure that the materials delivered to the installation site are safeguarded 
from the time of purchase until the finished ceiling is handed over. However, it is usually the main contractor who is 
responsible for the conditions on site so both parties must be aware of the requirements of suspended ceilings for flat 
dry, clean and safe storage conditions. 

Poor or rough handling, rolling or dropping of the product on corners or edges may cause damage to the product or the 
product to deteriorate.  

Lengths of Node should not span between points as any load applied mid-span may cause product damage. 

Site storage of items should be flat, preferably on a suitable pallet (supporting the entire length) without additional top 
loading. 

Consideration should be given to the advice of the Occupational Health and Safety Representative regarding manual 
handling. An assessment should be made of any risk and if necessary mechanical lifting equipment should be used. 

The storage space must be cleared of debris and, in general, should be enclosed. The Node Recessed Channel should be 
kept clean, dry and protected from the elements. 

Site conditions should be prepared for installation of the Node Recessed Channel. The site should be clean, dry and clear 
of other trades working in the ceiling void.  

Tools Required 

                       Recessed Channel 

                                          Installation Guide 

Node Recessed Channel  

Installation Guide  

 

 

Site Conditions, Storage & Handling: 

Read the Installation guide before handling. 

Always wear appropriate hand protection when handling. 

Only store in clean dry conditions 

Do not over stack. 

Do not stack in a way likely to cause falls. 

It is the responsibility of the installer to ensure that the materials delivered to the installation site are safeguarded from 

the time of purchase until the finished ceiling is handed over. However it is usually the main contractor who is 

responsible for the conditions on site so both parties must be aware of the requirements of suspended ceilings for flat 

dry, clean and safe storage conditions. 

 

Poor or rough handling, rolling or dropping of the product on corners or edges may cause damage to the product or the 

product to deteriorate.  

 

Lengths of Node should not span between points as any load applied mid-span may cause product damage. 

Site storage of items should be flat, preferably on a suitable pallet (supporting the entire length) without additional top 

loading. 

 

Consideration should be given to the advice of the Occupational Health & Safety Representative regarding manual 

handling. An assessment should be made of any risk and if necessary mechanical lifting equipment should be used. 

  

The storage space must be cleared of debris and, in general, should be enclosed. The Node Recessed Plenum Channel 

should be kept clean, dry and protected from the elements. 

 

Site conditions should be prepared for installation of the Node Recessed Plenum Channels, the site should be clean dry 

and clear of other trades working in the ceiling void.  

Installation Sequence

The Node Recessed Plenum Channel ships fully assembled (skirts, mounting bracket, bridge plates and Node Face Plate). 

 

Note:

 

All mounting hardware and sub structure to be supplied and installed alongside the Node Flush Channel assembly.  

           Lighting & other services must be installed by qualified personnel.  

 

It is recommended that the Node Recessed Channel is supported no more than 150mm from an end or 150mm from any 

joint. 

Read and save these instructions before beginning to install the Node Recessed Channel. 

Warning!

 

To reduce the risk of fire, electric shock, or injury to persons, observe the following:

•  When cutting or drilling into wall or ceiling do not damage electrical wiring and other hidden utilities

•  Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the 

manufacturer or PARC Technical Support.

Before You Start

Inspect all product parts for flaws and shipping damage. 

If anything is discovered to be damaged, contact the shipping company and manufacturer immediately. 

Warning! Damaged or missing parts must be reported to PARC at [email protected]

[email protected] immediately, PARC will 

not be responsible for any damage or loss that occurs during unpacking or installation.

Summary of Contents for Parc Node Recessed Channel

Page 1: ...Recessed Channel Installation Guide...

Page 2: ...3 Before You Start 3 Tools Required 3 Site Conditions Storage and Handling Instructions 3 Node Recessed Channel Installation Sequence 4 Recessed Channel to Ceiling Panels 4 Recessed Channel to Plaste...

Page 3: ...hting and other Node devices and intermittent supporting bridge plates The recessed assembly is designed to be installed in ceilings with recessed voids between ceiling panels or plasterboard Figure 1...

Page 4: ...the installer to ensure that the materials delivered to the installation site are safeguarded from the time of purchase until the finished ceiling is handed over However it is usually the main contra...

Page 5: ...ssembled skirts mounting bracket bridge plates and Node face plate Note All mounting hardware and sub structure is to be supplied and installed alongside the Node Recessed Channel Lighting and other s...

Page 6: ...LE HEX DRIVE SIZE 5 32 INSTALLATION BY OTHERS Connecting Node Channels Roll pins are supplied which must first be knocked into place then pressing together two sections of channel Node Recessed Channe...

Page 7: ...rking out the area where the plenum box will be situated and scoring the plastic extrusion whilst still installed in the channel Once three sides have been cut the plastic can be twisted and snapped o...

Page 8: ...red Figure 10 Cutting Node Recessed Channels to Length Where possible the channel should be ordered to length based upon contractor site measurements If the channel must be cut to length the end cap s...

Page 9: ...inate with the services layout Node Recessed Channel Plenum Installation Sequence Mount the plenum on top of the Node channel using the pre drilled holes in the flanges Figure 12 118 11 3000 MAX LENGT...

Page 10: ...P MECHAN CONTA CONTRO CONTR NOMENC ALL CO UNLES INSTL INSTAL BY OT TBC D NOTES PRODU TEXTU QUALIT REFER ISOMETRIC VIEW TOP VIEW 118 11 3000 MAX LENGTH GENERAL CONTRUCTION RECESSED CHANNEL WITH DIFFUSE...

Page 11: ...m at design stage and can be purchased separately from the Node Recessed Channel Outer Node housings will be factory installed in the required locations The Node devices are installed in the housing b...

Page 12: ...between the outer housing and device Persuasively slide the Node tool anti clockwise until the Node device is released Figure 15 Waste Disposal Management PARC Node Channels are shipped and packaged w...

Page 13: ...to review alter amend or remove published data without notice as our policy is one of constant improvement The information contained in this installation guide is believed to be correct at the date of...

Reviews: