Confirmat Screws
STEP 10
Estimated Time: 5 minutes
Attach center gables
(C3)
to the bottom with Confirmat screws
C3
C3
STEP 11
Estimated Time: 5 minutes
11a
Screw 4 green twister dowels into underside of top as shown
Hammer plastic dowels halfway
into the center holes on the
underside of the top
11b
11a
11a
11c
Attach top and tighten cams on left and right sides
Unlocked
Locked
Turn 210°
Page 7 of 8