Owner’s manual

 

Page 10/14

 

20220816 

Phosphorus removal unit (DpEC) 

 

Item # 339921 

 

5.2.

 

EC unit 

A local Premier Tech service partner or a qualified third party as referred to in section 1x.2) of the 

Regulation respecting waste water 

disposal systems for isolated dwellings (Q-2, r.22) 

will perform the maintenance of your EC unit. This visit has the double purpose of 

verifying that all the components are operational and if the consumable Aluminium Electrodes need to be replaced. The pumping out of 
the EC unit is not a regular procedure and must be performed only in the presence of a major system malfunction. It is important to 
remember that a balance is established between the EC unit and the primary reactor, as long as the sludge pump operates normally. 

5.3.

 

Watertight sand filter 

The maintenance of the watertight sand filter is limited to ensuring the proper working of the components of the Pumping Stations 
(PAS-FAS and FAS-TLP).

 

6.

 

Sampling 

As stipulated in the section below of the Regulation respecting wastewater disposal systems for isolated dwellings (Q-2, r.22):  

 

 

87.30.1. Effluent analyses:

 The owner of a tertiary treatment system with disinfection, phosphorous removal or disinfection and 

phosphorous removal must, at least once per 6-month period, have a sample of the system’s effluent analyzed to determine the 
concentration, if any, of fecal coliforms or total phosphorous.  

 

The owner must send the analysis reports within 30 days of their receipt to the municipality in whose territory the treatment system 
is situated. In addition, the owner must keep the reports for 5 years and make them available to the Minister at the Minister's 
request. 

 
The Maintenance Contract Agreement offered by Premier Tech includes the sampling visit performed every 6 months. 

7.

 

What to do in case of... 

7.1.

 

An activated alarm 

If an alarm is activated, and that is it unrelated to a power failure, contact Premier Tech’s After-Sales Service department 
so the problem can be identified and corrected.  

7.2.

 

A prolonged power failure 

If a power failure occurring in winter is prolonged, you should take precautions to protect your septic installation against 
freezing. If you have any questions regarding the restart of your system, contact Premier Tech’s After-Service department.  

7.3.

 

Flooding 

Certain sites are prone to seasonal flooding or to rises in groundwater levels. This can lead to a malfunction in your septic 
system or alter the performance of your phosphorus removal unit (DpEC), as it would for any septic installation. If this 
happens, contact Premier Tech’s After-Sales Service department.  

 

 

Summary of Contents for REWATEC Phosphorus removal unit

Page 1: ...Owner s manual Phosphorus removal Certified to BNQ standard NQ 3680 910 2022 Certified to CAN BNQ standard 3680 600...

Page 2: ......

Page 3: ...ed with a watertight sand filter it is an NQ 3680 910 and CAN BNQ 3680 600 certified disinfection system This document contains information concerning the operating guidelines the maintenance as well...

Page 4: ...treatment systems designed by Premier Tech are a technological advancement based on phosphorus removal by electrocoagulation This technology specially developed to treat wastewater from onsite applica...

Page 5: ...odes During system operation the wastewater is mixed with aluminium particles freed from the electrodes The aluminium charged effluent from the reaction zone then transfers freely to the separation zo...

Page 6: ...inuous or intermittent use without requiring any special precautions and without any impact on the quality of the treatment The owner has no particular action to make to bring the system into operatio...

Page 7: ...coffee beans cigarette butts sanitary napkins tampons condoms cotton swab etc It is important that anyone using or maintaining the septic installation or property installer landscaper owner snow remo...

Page 8: ...e system can be postponed No request for delayed start up will be accepted any later than one 1 year after the purchase date without this affecting the product s warranties 2 4 Start Up Upon the compl...

Page 9: ...eatment system There must be a follow up with the proper verifications The TEST button allows you to check if the alarm system is working properly During a test the red indicator should light up and a...

Page 10: ...es is mandatory Use four 4 separate circuit breakers two to operate the control panel one to connect the alarm box and the last one for TLP FAS when required No other household appliance should be con...

Page 11: ...recommend that you keep all invoices and documents returned to you as proof of the regular maintenance of your system 5 1 Primary reactor The pumping out of the primary reactor must be performed when...

Page 12: ...n and phosphorous removal must at least once per 6 month period have a sample of the system s effluent analyzed to determine the concentration if any of fecal coliforms or total phosphorous The owner...

Page 13: ...time of publication Premier Tech Ltd makes no warranties or representations as to its accuracy Because of its continuous improvement policy Premier Tech Ltd and its affiliated companies reserve the ri...

Page 14: ...ech or by a qualified third party as referred to in section 1x 2 of the Regulation respecting waste water disposal systems for isolated dwellings Q 2 r 22 h Any damage or problem caused by an omission...

Page 15: ...r the Customer s Successors to cover the cost of the inspection 10 INTERPRETATION The terms and conditions of this warranty shall be interpreted according to and governed by the provisions of this war...

Page 16: ...I hereby declare that the residence serviced by a Premier Tech treatment system located at the above address changed ownership on this date If you are the PREVIOUS owner I have provided the system s O...

Reviews: