Premier Tech Aqua ASP06P Installation, Operation And Maintenance Manual Download Page 9

OM0006 Conder ASP HDPE  Rev 5.2  

9

 

  

 

Summary of Contents for ASP06P

Page 1: ...20BOD 30SS 20NH3 N Premier Tech Aqua Ltd 2 Whitehouse Way South West Industrial Estate Peterlee County Durham SR8 2RA Tel 44 0 8702 640004 Fax 44 0 8702 640005 Email ptauk sales premiertech com Web ww...

Page 2: ...OM0006 Conder ASP HDPE Rev 5 2 2...

Page 3: ...OM0006 Conder ASP HDPE Rev 5 2 3 Table of Contents 2 5 7 7 8 9 10 12 14 15 16 18 20 21 35 36 36 37...

Page 4: ...OM0006 Conder ASP HDPE Rev 5 2 4 38 39 40 43 44 51 53 60 61 62 63 64 66...

Page 5: ...OM0006 Conder ASP HDPE Rev 5 2 5...

Page 6: ...OM0006 Conder ASP HDPE Rev 5 2 6...

Page 7: ...OM0006 Conder ASP HDPE Rev 5 2 7...

Page 8: ...OM0006 Conder ASP HDPE Rev 5 2 8...

Page 9: ...OM0006 Conder ASP HDPE Rev 5 2 9...

Page 10: ...OM0006 Conder ASP HDPE Rev 5 2 10...

Page 11: ...OM0006 Conder ASP HDPE Rev 5 2 11...

Page 12: ...OM0006 Conder ASP HDPE Rev 5 2 12...

Page 13: ...OM0006 Conder ASP HDPE Rev 5 2 13...

Page 14: ...OM0006 Conder ASP HDPE Rev 5 2 14...

Page 15: ...OM0006 Conder ASP HDPE Rev 5 2 15...

Page 16: ...OM0006 Conder ASP HDPE Rev 5 2 16...

Page 17: ...OM0006 Conder ASP HDPE Rev 5 2 17...

Page 18: ...OM0006 Conder ASP HDPE Rev 5 2 18...

Page 19: ...OM0006 Conder ASP HDPE Rev 5 2 19...

Page 20: ...OM0006 Conder ASP HDPE Rev 5 2 20...

Page 21: ...OM0006 Conder ASP HDPE Rev 5 2 21...

Page 22: ...OM0006 Conder ASP HDPE Rev 5 2 22...

Page 23: ...OM0006 Conder ASP HDPE Rev 5 2 23...

Page 24: ...OM0006 Conder ASP HDPE Rev 5 2 24...

Page 25: ...OM0006 Conder ASP HDPE Rev 5 2 25 7 Integrated blow er ventilation Air inlets...

Page 26: ...OM0006 Conder ASP HDPE Rev 5 2 26...

Page 27: ...27 13 HOSETAI L AIR HOSE HOLE IN HOUSING FOR AIR HOSE AIR INLET AIR INLET AIR OUTLET CUT HOLE FOR DUCT AND SEAL AFTER DUCT MIN 50mm GROUND LEVEL BLOWER FIX WITH JUBILEE CLIP ONTO BRASS FITTING GROUND...

Page 28: ...OM0006 Conder ASP HDPE Rev 5 2 28...

Page 29: ...OM0006 Conder ASP HDPE Rev 5 2 29...

Page 30: ...and 2 on Main lid Blower box Diameter to suit cable glandaccordingly STEP 3 Fit Cable Gland for supply 1 and 2 on Mainlidand blower box showing in the picture above making sure thisisfully sealed Allo...

Page 31: ...OM0006 Conder ASP HDPE Rev 5 2 31...

Page 32: ...OM0006 Conder ASP HDPE Rev 5 2 32...

Page 33: ...ected household s Check the electrical supply has been installed by a qualified electrician Sw itch the Blow er Isolator to ON Check the air blow er runs Check the aeration pattern in the bio zone Whe...

Page 34: ...OM0006 Conder ASP HDPE Rev 5 2 34...

Page 35: ...OM0006 Conder ASP HDPE Rev 5 2 35...

Page 36: ...OM0006 Conder ASP HDPE Rev 5 2 36...

Page 37: ...0006 Conder ASP HDPE Rev 5 2 37 Obtain a sample of the final effluent to check that the plant is operating correctly Thismay require introducing a small flow into the treatment unit to obtain the samp...

Page 38: ...OM0006 Conder ASP HDPE Rev 5 2 38...

Page 39: ...ns See page 12 for dimensions Drain Inlet Invert m See page 12 for dimensions Depth from Inlet Invert m See page 12 for dimensions Pipework Connections 110 Socket inlet 110 rubber grommet outlet Appro...

Page 40: ...OM0006 Conder ASP HDPE Rev 5 2 40...

Page 41: ...OM0006 Conder ASP HDPE Rev 5 2 41...

Page 42: ...OM0006 Conder ASP HDPE Rev 5 2 42...

Page 43: ...onder ASP HDPE Rev 5 2 43 STEP 1 Cut hose approximately 100mm from blower STEP 2 Place Jubilee clips over hose STEP 3 Place T piece in the middle of the hose pipe STEP 4 Tighten all Jubilee clips up s...

Page 44: ...OM0006 Conder ASP HDPE Rev 5 2 44 PLEASE NOTE Round Float will NOT be fitted to top 2 pump Vertical Switch will be fitted See Page 10 11 for details...

Page 45: ...OM0006 Conder ASP HDPE Rev 5 2 45...

Page 46: ...OM0006 Conder ASP HDPE Rev 5 2 46...

Page 47: ...OM0006 Conder ASP HDPE Rev 5 2 47...

Page 48: ...OM0006 Conder ASP HDPE Rev 5 2 48...

Page 49: ...OM0006 Conder ASP HDPE Rev 5 2 49...

Page 50: ...OM0006 Conder ASP HDPE Rev 5 2 50...

Page 51: ...olator Power Failure Switch on Checkthe supply board for a trip or fuse Air bloweris running but no turbulence Air pipe hasbeen blocked or squashed or hasa problemsuch as the hose is split Air blower...

Page 52: ...plant or if a de sludge is required Checkair blower and air lines Grease particles in the bio zone Too much grease in effluent Excessive laundry use Reduce grease in kitchen waste See laundry section...

Page 53: ...OM0006 Conder ASP HDPE Rev 5 2 53 n...

Page 54: ...OM0006 Conder ASP HDPE Rev 5 2 54 Do...

Page 55: ...OM0006 Conder ASP HDPE Rev 5 2 55 Don t...

Page 56: ...OM0006 Conder ASP HDPE Rev 5 2 56...

Page 57: ...OM0006 Conder ASP HDPE Rev 5 2 57...

Page 58: ...OM0006 Conder ASP HDPE Rev 5 2 58...

Page 59: ...OM0006 Conder ASP HDPE Rev 5 2 59...

Page 60: ...is fully sealed to prevent backfill entering the system Blower container To be fitted to the extension Ground level must not exceed this level Extension Shaft To be adjusted to suit ground level Secur...

Page 61: ...l After cutting the shaft please refer to APPENDIX G for installation guide PLEASE NOTE Upon installation of the extension shaft please ensure extension shaft is fully sealed toprevent backfill enteri...

Page 62: ...unit to the electrical equipment see Electrical Installation p 16 Don t Install any Conder ASP units deeper than the supplied access turrets i e do not extend the turrets Incorporate a standard house...

Page 63: ...Rev 5 2 63 Please remove transport packaging Foam Plastic Bag before operating this plant When the plant arrives it is fitted with a rubber plug This Must be removed before operating Rubber Plug is re...

Page 64: ...han 3 mm and not greater than 12 mm Aggregate MUST be clean and free flowing free from large rocks dirt sand roots organic materials or debris Material MUST be washed or screened to remove fine partic...

Page 65: ...ndary Backfill materials Gravel The Gravel MUST not contain any rocks larger than 36 mm on largest dimension Backfill materialsMUST becleanandfreeflowing free from dirt clay finesand roots organic mat...

Page 66: ...n The design of the tank assumes minimal compaction of the surrounding concrete Where necessary this may be extended to include light internal vibration Do not use deep re vibration which will substan...

Page 67: ...excavation until the final pour of concrete has set Failure to do this may result in voids beneath the tank Fill the tank with clean water to a depth of 300mm and recheck the pipework levels and conne...

Page 68: ...OM0006 Conder ASP HDPE Rev 5 2 68 Maintenance records Plant Commissioning Date Commissioning Company Notes 1st Plant Service Date Co 2nd Plant Service...

Page 69: ...OM0006 Conder ASP HDPE Rev 5 2 69 Date Servicing Company Notes 3rd Plant Service Date Servicing Company Notes 4th Plant Service Date Servicing Company Notes 5th Plant Service...

Page 70: ...OM0006 Conder ASP HDPE Rev 5 2 70 Date Servicing Company Notes 6th Plant Service Date Servicing Company Notes 7th Plant Service Date Servicing Company Notes 8th Plant Service...

Page 71: ...OM0006 Conder ASP HDPE Rev 5 2 71 Date Servicing Company Notes 9th Plant Service Date Servicing Company Notes 10th Plant Service Date Servicing Company Notes...

Page 72: ...Address _____________________________________________________________________________ Postcode _____________________________________________________________________________ Telephone Number __________...

Page 73: ...Co Du rh a m SR8 2 RA Premier Tech Aqua Ltd 2 Whitehouse Way South West Industrial Estate Peterlee Co Durham SR8 2RA STEP 2 Fit Warranty Activation Form inside Envelope see reverse for details STEP 1...