background image

Installation 

Instructions 

           Page 

3

Parts List

This ceiling adapter is shipped with all proper installation hardware and components. Make sure that none of these parts 
are missing and/or damaged before beginning installation. If there are parts missing and/or damaged, please stop the 
installation and contact Premier Mounts (800-368-9700).

Pipe Clamp (Qty 4)

Installation Tools

Phillips Head Screwdriver  

Wire Cutters 

 

     Ladder 

 

¼” x 3” Eye Lag Screws (Qty 4)

PP-FCMA-QL

Braided Cable (Qty 4 Strands)

Quick Locks (Qty 4)

PP-FCMA-QL(Qty 1)

1/4-20 KEP Nut (Qty 4)

M8 Flat Washers (Qty 4)

M8 x 20mm Phillips Head Screws (Qty 4)

M5 x 16mm Phillips Head Screw 

(Qty 1)

EMT Conduit Pipe (Optional - Qty 2)

Commercially Available

Rubber Caps (Qty 4)

24” T-Bar Frame (Qty 1)

Commercially Available

¼” x 3” Concrete Anchors (Qty 4)

Summary of Contents for PP-FCMA-QL

Page 1: ...a Avenue Anaheim CA 92806 USA USA and Canada Phone 800 368 9700 Fax 800 832 4888 EUROPE Swallow House Shilton Industrial Estate Shilton Coventry England CV79JY Phone 44 0 2476 614700 Fax 44 0 2476 614...

Page 2: ...people should perform the assembly procedure Injury and or damage can result from dropping or mishandling the product SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUC...

Page 3: ...contact Premier Mounts 800 368 9700 Pipe Clamp Qty 4 Installation Tools Phillips Head Screwdriver Wire Cutters Ladder x 3 Eye Lag Screws Qty 4 PP FCMA QL Braided Cable Qty 4 Strands Quick Locks Qty 4...

Page 4: ...rnings before continuing Step 1 Carefully remove the 24 x 24 or depending on your ceiling configuration the 24 x 48 suspended ceiling tiles Observe the room and the ceiling find the proper location fo...

Page 5: ...the cable locks on the plate Step 3 Run the open end through the hole in the eye lag screw Step 4 Run the open end through the loop Step 5 Pull the open end down until the braided cable tightens aroun...

Page 6: ...Step 1 Install the PP FCMA QL plate securely onto the T bar framework with the mounting studs face down according to your installation configuration Ceiling Mounting Studs on the Bottom 24 T Bar Comm...

Page 7: ...steps 1 through 3 for the remaining pipe clamp installation Attaching the Pipe Clamps PP FCMA QL Step 1 For added security slide two 2 3 4 EMT conduit pipe commercially available through the pipe cla...

Page 8: ...irectional Input Arrows Feed braided cable into the cable lock see directional input arrows To release the braided cable slide the release pin to disengage the braided cable Release Pin Release Pin Re...

Page 9: ...4 When adjusting the tension of the weight bearing side of the Quick Lock the cable must be pulled through the Quick Lock until the desired tension is attained Once attained pull the braided cable th...

Page 10: ...ed base box for further operating instructions Electrical installation should be done in accordance to local codes and regulations Step 1 Cut the tile where the electrical base box is going to be secu...

Page 11: ...in inches mm Securing Pipe to the PP FCMA QL Step 1 Secure the 1 NPT pipe to the ceiling plate and tighten by using one 1 M5 x 16 Phillips head screw supplied to the plate The M5 x 16 Phillip head sc...

Page 12: ...NCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE PREMIER MOUNTS IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES INCLUD ING BUT NOT LIMITED TO INABILITY TO USE ITS...

Reviews: