background image

SOLID STRUCTURE

SINGLE STUD

8.00

6.00

5.625

TOP 

JAM NUT

 1-1/2" NIPPLE

BOTTOM 

PLATE

PLATE

 1-1/2 (NTP) PIPE

(OPTIONAL)

COUPLING

4.50

4.50 6.75

6.00

TENSION
SCREWS

SAFETY

SCREWS

SCREWS

TENSION

SAFETY

SCREWS

TENSION
SCREWS

SCREW

M6 X 12 (MM)

SCREWS

SAFETY

JAM NUT

TOP PLATE

 1-1/2 NIPPLE

SCREWS

TENSION

SCREW

M6 X 12 (MM)

SCREWS

SAFETY

JAM NUT

 1-1/2 NIPPLE

(OPTIONAL LENGTH)

TOP PLATE

CEILING STRUCTURE

CEILING STRUCTURE

 
 

 

PROJECTOR MOUNT

 

 
 

 
 
 
 
 
 
 
 
 

 

 

 

 
 
 
 
 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 
 
 
  

 
 
 
 
STEP 1 

 Unpack the Gyrolock® and see 

(WARNING)

 label before installing to any 

structure. Select the proper location for the Gyrolock®. They are two (2) 
mounting points for a single stud installation and four (4) mounting points 
for a solid structure installation. 
 

SINGLE STUD:

 

Locate the center of the single stud where the Gyrolock® 

will be installed. The two (2) center mounting points for this installation 
must be used. Secure the upper plate to the single stud with the two (2) 
#14 wood screws (supplied). Start to secure the plate to the outer 
mounting points first. The plate may travel ½" front to back from center. 
Secure the final wood screw to the center of the upper plate. 

See (Fig 1).

 

SOLID STRUCTURE:

 Locate the structure where the Gyrolock® will be 

located. Secure the upper plate to the structure by using the four mounting 
points found on the upper plate. Use suitable hardware (commercially 
available) depending on the installation requirements. 

See (Fig 1,2)

 

            
 
 
 
 
 
 
 

 
 
 
 
 
 
            Fig 1 
 
 
 
 
 
 
 
 
 
 
 
 
            Fig 2 
 
 
 
 
 
 
 
 
 
 
 

 
 
STEP 2 

Screw the fully threaded nipple to the secured top plate. Use the jam screw 
(supplied) to secure the pipe. Screw the PBC coupling to the threaded nipple 
or (optional) 1-1/2" pipe and secure the M6 x 12 Phillip screw (supplied).  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

INSTALLATION INSTRUCTIONS 

PBC-1.5 SERIES 

WARNING! 

The wall or ceiling should be capable of supporting a weight 

of at least five (5) times the projector’s weight. If it cannot, the 

ceiling must be reinforced. Proper installation procedure by 

qualified personnel as outlined in the installation instructions 

must be adhered to. Failure to do so could result in serious 

personal injury. 

INSTALLING THE MOUNTING BRACKET 

CEILING INSTALLATION 

Refer to PBL installation instructions. 

Reviews: