Premier Mounts MVWS-3X3 Series Installation Download Page 3

North America  

800.368.9700

  | International 

+1-714-632-7100

 |  www.mounts.com

3

1/2”-13 Bolt

1/2”-13 Washer

1/2”-13 Nut

Step 2

Step 3

 

Warning

Secure the head using the 1/2-13” bolts, washer and 
nuts. 

Note: Use only the grade eight hardware supplied to 
mate the header assembly to the top of the wall 
frame! Using lower grade hardware could compromise 
the integrity and safety of the installation. 

With the displays installed and aligned per the first 
section of this manual, the video wall is ready to 
be suspended using the customer supplied  
suitable rigging hardware and qualified personal 
to fly the completed video wall system.

If you are not using the base assembly shown 
above during the assembly of the wall system, the 
displays  must be positioned so that the lowest 
row of displays sits above the bottom of the video 
wall. Positioning the bottom of the displays lower 
than the bottom of the video wall will severely 
damage the displays when lowered to the ground.

9589-006-001-00 REV.1

Reviews: