background image

PDS-PLUS 

Installation Instructions

Page - 9 - 

4.  Attach  the  base  box  to  the  upper  bridge  and  secure  with  the  six  (6)  M6  x  12mm  Phillips  Head  screws  (above).  DO  NOT 

 

OVERTIGHTEN THESE SCREWS AT THIS TIME.

Concrete Mounting 

       The  PDS-PLUS  can  be  mounted  to  a  ceiling with  a  minimum  6”  thickness.  Concrete  wedge  anchors  must  be  used  for 

concrete installation. It is recommended that ¼” wedge anchors be used. A masonry bit must be used to drill the pilot hole. 

These can be purchased at your local hardware store. 

1.  Begin by placing the upper bridge into position against the ceiling, keeping it level.  

2.  Mark off four holes to be used for securing the mount and place the upper bridge aside.  

3.  Next, drill holes using the appropriate masonry bit for your anchor.  

4.  Insert a concrete anchor into each hole.  

5.  If necessary, a hammer can be used to lightly tap each anchor into place so that they are flush with the ceiling. 

6.  Once all of the anchors are in place, move the upper bridge back into position.  

7.  Attach the nut onto the threaded shaft that is protruding from the ceiling.  

8.  Do not tighten until all nuts are in place. 

Ceiling Wood Stud 

Ceiling Surface 

Base Box 

M6 x 12mm Phillips 
Head Screw 

 

Summary of Contents for Low-Profile Universal Projector Mount PDS-PLUS

Page 1: ...a Avenue Anaheim CA 92806 USA USA and Canada Phone 800 368 9700 Fax 800 832 4888 Swallow House Shilton Industrial Estate Shilton Coventry England CV79JY Phone 44 0 2476 614700 Fax 44 0 2476 614710 P O...

Page 2: ...E INSTALLATION INSTRUCTIONS MUST BE ADHERED TO FAILURE TO DO SO COULD RESULT IN SERIOUS PERSONAL INJURY OR EVEN DEATH SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE INSTALLATION OF THIS PRO...

Page 3: ...y 1 M6 x 12mm Phillips Pan Head w Integrated Split Washer Qty 12 6 come preinstalled on the PDS Base Box Nylon Spacer Qty 2 14 x 2 Wood Screws Qty 2 Flat Washer Qty 2 M6 x 8mm Socket Head Set Screw Qt...

Page 4: ...x 12mm Security Head Screw Qty 4 M3 x 16mm Phillips Head Screw Qty 4 M3 x 16mm Security Head Screw Qty 4 M3 Flat Washer Qty 10 M3 Flat Washer Qty 10 M4 x 12mm Phillips Head Screw Qty 4 M4 x 12mm Secur...

Page 5: ...r D e l b a t r o P e r u s a e M e p a T l i c n e P d e i l p p u S h c n e r W n e l l A y t i r u c e S 5 M r e d d a L Phillips Head Screw Driver M3 Security Allen Wrench Supplied 1 8 Drill Bit...

Page 6: ...t configurations if applicable that the PDS PLUS can be used with The CLS adapter will be used in conjunction with the PP FCTA and the PP FCMA Please refer the Installation Instructions that come pack...

Page 7: ...tandard threaded pipe NPT to one of Premier Mount s optional ceiling adapters see page 6 or to a single wood stud see Page 8 If using an optional adapter please refer to the installation instructions...

Page 8: ...ngle wood stud mounting depending on your ceiling configuration The adjustable channel slots on the upper bridge plate will allow you to fine tune the final orientation of the projector 3 Secure the U...

Page 9: ...store 1 Begin by placing the upper bridge into position against the ceiling keeping it level 2 Mark off four holes to be used for securing the mount and place the upper bridge aside 3 Next drill holes...

Page 10: ...points 2 Test each size of the screws provided 3 The correct screws should thread easily into the mounting point and not pull out when pressure is applied DO NOT OVERTIGHTEN YOUR MOUNTING SCREWS TO T...

Page 11: ...unting leg rotate the leveling barrel counter clock wise 5 When the desired position is achieved tighten the mounting screws to the projector and then tighten the hex head leg screws with the M5 Allen...

Page 12: ...the following three steps 1 Determine where the mounting point is located 2 Place the projector plate over the mounting point 3 Insert the 20 x 5 16 security screw This screw will use a standard hole...

Page 13: ...PDS PLUS Installation Manual Page 13 2 Slide the projector forward see arrow above 3 Make sure the bracket is resting on the Base Box before letting go of the projector...

Page 14: ...Phillips Head screws w Integrated Washers one on each side If using the optional Lock It Security Hardware Pack secure the PDS PLUS to the PDS Base Box with two 2 M6 x 12mm Security Head screws and tw...

Page 15: ...ter screws and work your way to the outside screws making any final adjustments prior to tightening the last two screws 3 You can adjust the tilt of the projector by loosening the two 2 M6 x 12mm scre...

Page 16: ...PDS PLUS Installation Manual Page 16 Technical Specifications All measurements are inches mm...

Page 17: ...UDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE PREMIER MOUNTS IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES INCLUDING BUT NOT LIMITED TO INABILITY TO USE ITS PRO...

Reviews: