background image

 

- 7 -

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 5 

  Install the mount to the rear of the display with the mounting hardware supplied. Lift the display and mount assembly (minimum two people recommended) and 
secure to the base pan by allowing the mount tabs to be inserted fully into and down the receiving slots on the back of the plenum.  See figure 5. Decorate the 
front of the Plenum per customer request.  

Step 4 

  Install the ventilation assist fan (if used) on one of the three 10/32” thread mounting points in the top of the base pan with the three 10/32” nuts supplied.  
The fan supplied uses 110-volts A/C current and comes with “pig tail” ends. It is recommended the fan be wired to the same 110-volt A/C switch leg as the 
feeding power to the display. This will insure the operation during all times when the display is on. Install all power and signal interface cables. See figure 4. 

Plenum 

Muffin fan 

(3) 10/32” Hex 

nuts 

Figure 4 

Figure 5 

Wall structure 

Receiving tabs 

on the plenum 

Mounting 

bracket 

Plenum 

Caution: All four (4) tabs 

must be fully inserted to 

the receiving tabs before 

letting go of the display. 

Muffin fan 

bracket 

studs 

 

Display 

Reviews: