
GB-INWAVP
Page 6
Visit the Premier Mounts website at http://www.mounts.com
Installation
Instructions
Use a drywall saw to remove the drywall in the area you
marked in
Step 2
.
Avoid cutting electrical wires, water pipes, or gas
lines! Remove a small piece of drywall and use a
fl
ashlight to look around for these hazards in the
area in which you will be cutting. Once you have
located any hazards, proceed to carefully remove
the rest of the drywall.
If you do locate any hazards, their presence may require
you to relocate either the hazard or your GB-INWAVP.
Consult a quali
fi
ed professional prior to relocating
electrical lines, gas lines, or water pipes.
Step 3
Drywall Installation (cont’d)
If you will be routing your audio, video, and/or data
connections through the wall, remove the 1½
″
knockout.
The 1½
″
knockout is easily removed by pressing hard
with your thumbs on either side of the knockout, then
twisting the knockout until it comes free.
Watch for sharp edges!
Step 4
Place your GB-INWAVP against wall.
Level your GB-INWAVP.
Use a pencil and draw an outline on the wall around
your GB-INWAVP.
This is where you will be cutting a hole in the
drywall for your GB-INWAVP. Be absolutely certain
that this is where you want it installed.
Your GB-INWAVP requires a minimum of ½
″
between the side of your GB-INWAVP and the
nearest wall stud for the In-Wall Clamps to properly
operate.
Step 2
1½
″
Knockouts for
Audio / Video / Data
Connections