
Page 2
CAUTION STATEMENTS
1. READ ALL STEPS WITHIN THIS MANUAL BEFORE INSTALLING THE MOUNT.
ABSEN ACCLAIM A27
LED SERIES INSTALLATION GUIDE
MUST BE READ IN CONJUNCTION FOR SUCCESSFUL
INSTALLATION. ANY QUESTIONS? CALL PREMIER MOUNTS.
2. INSTALLATION MUST MEETS THE REQUIREMENTS APPROVED BY THE STRUCTURAL ENGINEER.
3. FRAME MUST BE PLUMBED, SQUARED, LEVELED, X, Y, AND Z ALIGNED PRIOR TO INSTALLATION OF
ANY DISPLAYS.
4. ALL LED CABINETS MUST BE
POWER ON TESTED
PRIOR TO ANY INSTALLATION.
5. PREMIER MOUNTS RECOMMENDS THE HANDLING LED CABINETS BY AN INDUSTRY QUALIFIED
PROFESSIONAL.
6. PREMIER MOUNTS IS NOT RESPONSIBLE FOR DEFECTS, MISUSE, OR IMPROPER HANDLING OF THE
LED CABINETS.
Tools for Installation:
00.0
o
Spool of
colored strings
Anti-Static
Gloves
LASER
Solid or continuous plywood backing with a
min of 3/4” thickness
, sound and secured
to handle the total combined weight of the mount and LED cabinets.
±1/2” or 1” max adjustment range for flatness of wall, over the entire wall surface
WALL REQUIREMENTS:
MAX FLATNESS ADJUSTMENT
Installation Guide
- ABSEN A27
www.premiermounts.com | North America 800.368.9700 | Interna1-714-632-7100