PREFORMED LINE PRODUCTS POWER RAIL P8 Assembly Instructions Manual Download Page 6

Assembly Instructions, Power Rail P8 (Version 2, Rev A)  

5

2 Attach Power Rail to “L” Feet

The Power Rail overhangs beyond the outermost 

“L” Foot. This overhang is referred to as “cantilever”, 

or abbreviated as “C’ver”.  The distance between 

adjacent “L” Feet is referred to as “span”. The length 

of both the cantilever and the span are dependent on 

1 Install the “L” Feet

Secure “L” foot to appropriate anchoring device per 

the manufacturers instructions. Above is shown using 

the Power Rail PV Flash and attaching hardware.  

Position “L” foot on compression block and secure 

with 5/16” Hex Nut and Flat Washer. 

Torque to 14-16 

ft.-lbs.

CAUTION

NOTE

NOTE

Cantilever and 

span dimensions 

are a design spec-

ification. Consult 

the design manual 

to match these 

dimensions to site 

conditions. It’s im-

portant to use the 

unique cantilever 

and span dimen-

sion specific to the 

install. Failure to do 

so could lead to ex-

cessive deflection 

and/or premature 

system failure. 

L feet can be 

attached directly to 

the roof substrate 

with the proper 

hardware. See 

Power Rail Design 

Guidelines for more 

information.
Information on 

appropriate 

anchoring 

hardware is 

available on an 

individual product 

basis.

several factors, unique to each installation and are 

determined by the system design.
Measure and mark the cantilever dimension supplied 

by the design manual onto the Power Rail.

Insert 5/16” x 3/4” Turn Bolt into Power Rail and 

rotate 90-degrees, locking Turn Bolt in place. On the 

outermost “L” Feet align center of the “L” Foot with the 

cantilever mark on the Power Rail. Secure Power Rail 

to “L” Foot with 5/16” Flange Nut. 

Torque to 14-16 

ft.-lbs.

Turn bolts must 

be locked into 

the channel by 

rotating clockwise 

90-degrees. Use 

the indicator slot on 

the threaded end 

to identify whether 

or not the bolt has 

been locked.

Summary of Contents for POWER RAIL P8

Page 1: ...Assembly Instructions step by step assembly and installation Assembly Instructions Version 2 Rev A SP3412 1 PCN 021317 1 POWER RAILTM P8...

Page 2: ...clamps have integrated grounding and have been tested to UL 2703 See Module Compatibility List for list of approved modules Module Orientation Portrait or Landscape Power RailTM P8 Ratings Fire Class...

Page 3: ...uidelines They begin after all roof mounted attach ing hardware has been installed and se cured to the roof substrate They show the Power Rail Mounting Sys tem being installed on the Power Rail PV Fla...

Page 4: ...l P8 Main Components There are five main components and attaching hardware RAD End Clamp L Foot AMPTM Clamp Bonding Clamp P8 Power Rail Splice Plate two hole Splice Plate four hole Factory Assembled A...

Page 5: ...Foot 5 16 x 3 4 turn bolt flange nut Refer to Power Rail Design Guidelines 4 AMP Clamp 5 16 x RAD bolt flange nut 2 per 3 8 gap between modules 5 RAD End C l amp 5 16 x RAD bolt flange nut 4 per Rail...

Page 6: ...unique cantilever and span dimen sion specific to the install Failure to do so could lead to ex cessive deflection and or premature system failure L feet can be attached directly to the roof substrat...

Page 7: ...dules Splice Plates come in two configurations 2 hole or 4 hole above is a 4 hole Insert 5 16 x 3 4 Turn Bolts into Power Rail and rotate 90 degrees to lock Turn Bolts in place Align Splice Plate with...

Page 8: ...rted into the Power Rail and positioned between adjacent Modules Insert the 5 16 RAD Bolt into Power Rail and rotate 4 Install the Modules cont 90 degrees clockwise to lock the RAD Bolt within the Pow...

Page 9: ...8 Assembly Instructions Power Rail P8 Version 2 Rev A Grounding Bonding Path...

Page 10: ...C260PE REC265PE REC270PE Silfab 38 mm SLA260M SLA265M SLA270M SLA275M SLA280M SLA285M SLA290M SLA295M SLA300M Solar World 31 mm SW280 31mm 33 mm SW280 285 290 295 300 33 mm SW 320 XL 33mm FR SW 325 XL...

Page 11: ...Web Site www preformed com E mail inquiries preformed com Albuquerque Office 1700 Louisiana Blvd Suite 130 Albuquerque NM 87110 Telephone 800 260 3792 Fax 505 889 3548 Web Site www DPWSolar com E mai...

Reviews: