background image

Hopper (Pre Assembled)

Leg Stand (04)

Hopper (Pre Assembled)

Side Handles (06)

Top Handle (07)

Side Handle (06)

Hardware Sack

Leg Stand (04)

Leg Stand (04)

Top Handle (07)

Side Handles (06)

Top Handle (07)

Control Cable 

DS1000D & DS1000DGY Drop Spreader

INSTRUCTIONS

 & Parts List

NOTE: Wheel may vary from pictures

Sheet Number: 3860 Rev 8/2005

In order to assure that the assembly of your spreader 
goes smoothly, please review all of the steps before 
proceeding. 

TIP:

 Loosely tighten all bolts until assembly 

is complete, then completely tighten.

Note: You may have extra hardware when assembly
is complete.

STEP 1 - BEGIN HERE

Lay out all of the parts shown below. If any are
missing, please turn this sheet over and contact us with
the information provided.

STEP 2 - Attach the Leg Stand

Hand tighten the

 Leg Stand (04)

 to the Hopper using

four 

1-1/4” Carriage Bolts (10)

 and 

1/4” Wing Nuts (12)

at the four locations shown below.

STEP 3 - Attach the Side Handles

Hand tighten the 

Side Handles (06)

 to the 

Leg Stand

(04)

 using two 

1-3/4” Carriage Bolts (11)

 and 

1/4” Wing Nuts (12)

 at the two locations shown 

below.

STEP 4 - Attach the Top Handle

Hand tighten the 

Top Handle (07)

 to the

 Side Handles

(06)

 using two 

1-3/4” Carriage Bolts (11)

 and 

1/4” Wing

Nuts (12)

 at the two locations shown below.

STEP - 5 Attach the Control Cable

Attach the 

Control Cable

 mechanism to the

Top Handle (07)

 using a 

2-1/4” Carriage Bolt (16)

and a 

1/4” Wing Nut (12)

 at the location shown

below.

Reviews: