Hopper (Pre Assembled)
Leg Stand (04)
Hopper (Pre Assembled)
Side Handles (06)
Top Handle (07)
Side Handle (06)
Hardware Sack
Leg Stand (04)
Leg Stand (04)
Top Handle (07)
Side Handles (06)
Top Handle (07)
Control Cable
DS1000D & DS1000DGY Drop Spreader
INSTRUCTIONS
& Parts List
NOTE: Wheel may vary from pictures
Sheet Number: 3860 Rev 8/2005
In order to assure that the assembly of your spreader
goes smoothly, please review all of the steps before
proceeding.
TIP:
Loosely tighten all bolts until assembly
is complete, then completely tighten.
Note: You may have extra hardware when assembly
is complete.
STEP 1 - BEGIN HERE
Lay out all of the parts shown below. If any are
missing, please turn this sheet over and contact us with
the information provided.
STEP 2 - Attach the Leg Stand
Hand tighten the
Leg Stand (04)
to the Hopper using
four
1-1/4” Carriage Bolts (10)
and
1/4” Wing Nuts (12)
at the four locations shown below.
STEP 3 - Attach the Side Handles
Hand tighten the
Side Handles (06)
to the
Leg Stand
(04)
using two
1-3/4” Carriage Bolts (11)
and
1/4” Wing Nuts (12)
at the two locations shown
below.
STEP 4 - Attach the Top Handle
Hand tighten the
Top Handle (07)
to the
Side Handles
(06)
using two
1-3/4” Carriage Bolts (11)
and
1/4” Wing
Nuts (12)
at the two locations shown below.
STEP - 5 Attach the Control Cable
Attach the
Control Cable
mechanism to the
Top Handle (07)
using a
2-1/4” Carriage Bolt (16)
and a
1/4” Wing Nut (12)
at the location shown
below.