
8. Route this
to the outboard side
of its link and attach the link to the
rear riser,
tight.
.
9. Again from the
reference,
follow the trailing edge to the right
stabilizer and pick up line
OD).
10. Route this line to the outboard
of its link and attach the link to
the right rear riser,
tight.
11. Return to the
reference
of the trailing edge.
and
pick up the left side upper control
lines consecutively. Verify their
continuity to the junction with the
lower control line.
12. Removing twists as you go, follow
the
lower control line to its running
end. Route it through the appropriate
slider grommet, and the guide ring.
13. Remove the toggle from the riser
and route the running end of the
lower control line through the toggle
attachment loop.
14.
the toggle up to the mark on
the control
Secure it with an
overhand knot tied
to the
toggle.
15. The control line attachment for the
right side is done in a similar
16. When the control
installation is
you may wish to compare
the two toggle
tension to ensure their
17. This is an appropriate time to
continuity of the control line
System. Begin at the trailing edge on
side, verifying that all twists have
been removed from the upper and
lower control lines. Also make sure
that the lower control lines have been
properly routed through their
appropriate slider grommets and
guide rings, and that toggles have
been properly secured equidistant
from the trailing edge.
18. Separate the
and
control line groups to their
sides and
the
reference
at the trailing edge.
19. Following the trailing edge control
sutface outboard will lead you to the
stabiliter’s
seam and the
attachment
of
1 D.
20. Holding D lines 1, 2, 3 and
in your right hand and D
lines
and
in your
hand, verify the continuity of the C
and D lines through the cascades to
their
rear risers.
21. Gather in the control lines and flip
the canopy over so the
edge
up. Verify this orientation by
locating the attachment
of A
lines 1 and
22. In the same
you flipped
the canopy, rotate the Container
harness-up.
23. Pick up the front riser groups,
follow them to the canopy, and
separate.
24. Pick up A lines 8,
and
you have continuous
lines, follow the bottom
seam down and pick up
Verify continuity of the A and B lines,
through the cascades, to the right
front riser.