3.1.1 Fixation of plastic sleeve
3. INSTALLATION
5
3.1 Hardware installation
●
Prepare always 20-30 cm of drainage gravel and check that it works:
fill the tube of water and check that it completely disappear within
30 min. If it doesn’t work study a further drainage system.
●
Aluminum sleeve must be installed on drainage layers, surrounding
concrete layers and leveled with external finish.
M
IN
. 2
00
CONCRETE
EXTERNAL FINISH
PLASTIC
SLEEVE
IP BOX
WIRING
DRAINAGE
INGROUND 3 + INGROUND 6 + INGROUND 9 WHITE
INSTRUCTIONS MANUAL v1.1
Summary of Contents for INGROUND 3 WHITE
Page 1: ...INGROUND 3 INGROUND 6 INGROUND 9 WHITE ON OFF INSTRUCTIONS MANUAL Round Square ...
Page 17: ......
Page 18: ......
Page 19: ......