41
Assignment of system connections. Top view.
C
B
C
D
G
F
A
E
Assignment of system connections. Isometric diagram.
B
C
G
H
F
D
E
A
A-Air Intake.
Ø200 mm
B-External wall
C-Air intake from
Ø200 mm
D-External air intake Ø200
mm. Slit 40mm
E-Ensure the slope
F-Terminal box
G-Extract air outlet to the
street Ø200 mm towards the
street
A-B4 204x60 mm
B-P2 Ø250 mm
C-Muffler Ø200/250 mm
D-Installation of flexible
insertion Ø200 mm
E-Insert plugs
F-PRANA -340S
G-B3
Ø
200 mm
H-П1 P1 Slit 40 mm
204x60 mm