![PR Lighting XR250 Product Manual Download Page 4](http://html1.mh-extra.com/html/pr-lighting/xr250/xr250_product-manual_1593248004.webp)
4/22
INSTALL THE PROJECTOR
Take 2 clamps and 1 safety cords out from the package and mount 2 clamps on the underside of fixture with 4 retainers attached to
each clamp. Hang the fixture on the structure and fasten the screws attached to each clamp. (See the
WARNING
on the underside of
the base as shown above) Always ensure that the projector is firmly anchored to avoid vibration and slipping whilst functioning.
Always ensure that the structure that you are going to mount the projector is secure and is strong enough to support the weight of the
fixture.
WARNING
1. The projector MUST be lifted or carried by the HANDLES instead of clamps.
2. For safety the safety cord should support 10 times of the unit’s weight.
FITTING THE LAMP
Unplug the projector from power before lamp
installation or replacement and wait for it to cool.
Lock the yoke before fitting/replacing the lamp.
Loosen 8 fast-fit screws and remove the back cover,
you can see the structure as shown in the figure 2..
After unplug the power wires, hold the end of the
lamp and push it as directed by the arrow resulting in
the other end of the lamp unblocked ,then pull the
lamp out. Before installing new lamp, plug the power
wires for the lamp tightly. Installation of the lamp is
an reverse sequence to the pull-out.
Fit new lamp and close the back cover by fastening 8
fast-fit screws.
Note:
don’t touch the bulb of the new
lamp with bare hand so as not to influence the beam
output; Do not harm the sticking out point of the lamp during its installation.
WARNING: Care should always be taken when handling these lamps. Always read the manufacturers "Instructions for
use" enclosed with the lamp.
CONTROL
PANEL
CLAMP
HANDLE
SAFETY CORD
10
6
106
WARNING
To pass 1 SAFETY CORD
through 2 holes for safety
FAST-FIT SCREWS
LAMP
A
B