A1: Description of Interface 2240 PROcheck
-
Plant Control
a)
Signals from Plant Control to 2240 PROcheck:
Description
Code
Signal
24 V to Pin
No.
GND to
Pin No.
Action 2240 PROcheck
Plant ON
CRON
13
10
Request for measurement
will be accepted if ready
for measuring
Request for measurement
on channel CHA1
MRQ1
12
10
starts
measuring cycle on
channel CHA1
Pin 6+19 open
Request for measurement
on channel CHA2
MRQ2
24
10
starts
measuring cycle on
channel CHA2
Pin 5+17 open
Request for measurement
on channel CHA3
MRQ3
11
10
starts
measuring cycle on
channel CHA3
Pin 3+16 open
Alarm
is acknowledged
AQUIT
23
10
Alarm is reset
Pin 2+14 open
b)
Signals from 2240 PROcheck to Plant Control:
(Contact configuration “NC”, see chapter 2.2.2)
Description
Code
Signal
Output
Instrument. ready for
measurement
PMSR
Pin 8+20 closed
Result on channel CHA1
is < main alarm
MOK1H
Pin 6+19 closed
Result on channel CHA2
is < main alarm
MOK2H
Pin 5+17 closed
Result on channel CHA3
is < main alarm
MOK3H
Pin 3+16 closed
Result on channel CHA1
is < pre alarm
MOK1V
Pin 6+18 closed
Result on channel CHA 2
is < pre alarm
MOK2V
Pin 4+17 closed
Result on channel CHA3
is < pre alarm
MOK3V
Pin 3+15 closed
Alarm or Failure
ALARM
Pin 2+14 closed
a4