SOP – How to assemble Battery Pack with 12 batteries (BP A72T-12x9Ah)
320mm
450mm
280mm
150mm
1
2
4
3
带套管
2
3
1
1
2
3
Black wire Red wire
Red/Black wires
pass here
3. Put the three batteries in order as shown in
chart.
Hint: Install the left one and keep battery
terminal heading the bottom. Then, install the
middle one and keep battery terminal heading
upwards. At least, install the right one and keep
battery terminal heading upwards.
4. Put grommet inside the hole of battery
divider and allow red and black wire passing
through the hole. Screw tightly the battery
divider with screw nuts. (as shown in 1, 2
areas), M4 screw nuts: 38-210003-00G*2
Torque: 8KGF-CM
5. Disconnect red wire from P1 of small board
and pass through divider with black wire.
6. Connect P5 and P10 on the small board with
2 black wires (450mm). Connect P5 with red
wire (320mm) and pass through divider with 2
black wires.
1.As shown, please use three batteries (12V/7Ah or
12V/9Ah
)
and check the date code (it’s necessary
to use batteries with same date code in a UPS unit).
Serial connect batteries with three black wires in
450, 280, 150 mm length. Slip the end of black wire
with 280mm length into the tube.
2. Connect red wire with 380mm length to battery
and slip red wire into the tube.
NOTE: This will prevent short circuit from direct
contact of terminal.
CAUTION:
1. Be sure all wires are plugged correctly and tightly. Do NOT break any
wire tubes. 2.Do NOT connect battery terminal to any metals. Otherwise, it will
cause short circuit. 3.
Any screw should be screwed tightly without missing.
Tool: electric screwdriver, crosshead screwdriver, nipper