SOP – How to assemble Battery Pack with 12 batteries (BP A72T-12x9Ah) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

320mm 

450mm 

280mm 

150mm 

带套管

 

Black wire  Red wire 

Red/Black wires 

pass here 

3. Put the three batteries in order as shown in 
chart. 

Hint: Install the left one and keep battery 

terminal heading the bottom. Then, install the 
middle one and keep battery terminal heading 
upwards. At least, install the right one and keep 
battery terminal heading upwards. 

4. Put grommet inside the hole of battery 
divider and allow red and black wire passing 
through the hole. Screw tightly the battery 
divider with screw nuts. (as shown in 1, 2 
areas), M4 screw nuts: 38-210003-00G*2 
Torque: 8KGF-CM 
5. Disconnect red wire from P1 of small board 
and pass through divider with black wire. 
6. Connect P5 and P10 on the small board with 
2 black wires (450mm). Connect P5 with red 
wire (320mm) and pass through divider with 2 
black wires. 

1.As shown, please use three batteries (12V/7Ah or 
12V/9Ah

  and check the date code (it’s necessary 

to use batteries with same date code in a UPS unit). 
Serial connect batteries with three black wires in 
450, 280, 150 mm length. Slip the end of black wire 
with 280mm length into the tube. 
2. Connect red wire with 380mm length to battery 
and slip red wire into the tube.

   

NOTE: This will prevent short circuit from direct 
contact of terminal. 

CAUTION: 

1. Be sure all wires are plugged correctly and tightly. Do NOT break any 

wire tubes. 2.Do NOT connect battery terminal to any metals. Otherwise, it will 
cause short circuit. 3. 

Any screw should be screwed tightly without missing.

 

Tool: electric screwdriver, crosshead screwdriver, nipper 
 

Summary of Contents for BP A72T-12x9Ah

Page 1: ...User Manual Battery Pack ...

Page 2: ...ironment The warranty for this battery bank will be void if water or other liquid is spilled or poured directly onto the battery box Similarly we do not warrant any damage to the battery box if foreign objects are deliberately or accidentally inserted into the battery box enclosure The battery will discharge naturally if the system is unused for a period of time It should be recharged every 2 3 mo...

Page 3: ... a recycling facility or ship it to your dealer in the replacement battery packing material Installation and Setup NOTE Before installation please inspect the unit Be sure that nothing inside the package is damaged Please keep the original package in a safe place for future use CAUTION A battery can present a risk of electrical shock and high short circuit current The following precaution should b...

Page 4: ...and pass through divider with black wire 6 Connect P5 and P10 on the small board with 2 black wires 450mm Connect P5 with red wire 320mm and pass through divider with 2 black wires 1 As shown please use three batteries 12V 7Ah or 12V 9Ah and check the date code it s necessary to use batteries with same date code in a UPS unit Serial connect batteries with three black wires in 450 280 150 mm length...

Page 5: ...void short circuit do NOT let nipper direct connect to battery terminals 8 Screw two battery dividers to main column tightly M3 6 round head screws M3 6 flat head screws Torque 8KGF CM 10 Organize black and red wires with a cable tie Tool electric screwdriver crosshead screwdriver nipper CAUTION 1 It s necessary to use batteries with the same date code During battery installation do not battery te...