PTX2-A3
Service Manual Rev.2
Page 18 of total 19 August 2007
5. Service Setting
Step 5: inset into PSDR board
Step 6: Connect with battery, release the remnant of electric power in UPS by using the lamps or above 30ohm/100Watt
resistance in advance, then connect with UPS.
10kVA Standard
Only the Jumper is different, other steps are following the 6kVA standard 1-6
Jumper between Pin 1 and Pin 2,
Pin 11 and pin 12