background image

3.1. Wire Connection

3. Setup and Function Setting:

If the LED display is in normal performing refer to “4.2.1”, you can control the gate by either transmitters or the button 
on the board: “UP”-clockwise moving, “SET”- stop and “DOWN”- Counterclockwise moving.

6

6

7

9

9

6

8

9

6

9

10

11

PPB-1

PPB-1, PKS-1:

PKS-1

SW1

SW3

SW4

SW5

3

4

PF-1

PF-1

AC INPUT

1

2

3

4

5

6

7

8

9

10

1

2

3

4

5

6

AC INPUT

1

2

3

4

5

6

7

8

9

10

11

1

2

3

4

5

6

6

 INSTRUCTIONS PL300E/PL400E/PL500E/PL800E SLIDING GATE OPENER USER MANUAL

LED2
LED1

AC INPUT

1

2

3

4

5

6

7

8

9

10

11

12

13

14

1

2

3

4

5

6

1

2

3

4

5

6

7

8

9

10

11

12

13

14

Close

Stop

GND

Pb

Ph+

Ph2

Ph1

GND

EXT

-

EXT+

GND

+13.75

Light

Open

AC INPUT

1

2

3

4

5

6

7

8

9

10

11

1

2

3

4

5

6

Green Box

Antenna

Summary of Contents for PL300E

Page 1: ...FOR RESIDENTIAL USER MANUAL 24V DC MOTOR SLIDING GATE OPENERS PL300E PL400E PL500E PL800E ...

Page 2: ...ccording to the following European Directives 2006 42 EC Machinery Directive Comply with the following Standards EN 301489 1 V1 8 1 2008 EN 301489 3 V1 4 1 2002 EN 300220 1 V2 1 1 2006 EN 300220 2 V2 1 2 2007 EN 60335 1 2002 A11 2004 A1 2004 A12 2006 A2 2006 A13 2008 EN 60335 2 103 2003 EN 62233 2008 EN 12445 2001 EN 12453 2001 And also declare that the machinery may not be put into service until ...

Page 3: ...Learning Reset Process and LED Display 3 4 Programmable Function Settings 3 5 Testing and Checking 3 6 SW2 SW6 Setting 4 Technical Characteriestics 4 1 Technical Data Sheet of Series 4 2 PH 1 Photocell Data Sheet 4 3 PR 1 Transmitter Data Sheet 4 4 PF 1 Flashing Light Data Sheet 4 5 PRB 1 External Receiver Box Data Sheet 5 Additional Information 5 1 Wire Connection of PH 1 Photocell Safety Beam 5 ...

Page 4: ...ause uncontrolled movement of the driven part due to mechanical failures or an out of balance condition when operating a biased off switch make sure that other persons are kept away when closing a window that has been opened by a fire sensing system make sure that other persons are kept away frequently examine the installation for imbalance and signs of wear or damage to cables springs and mountin...

Page 5: ...ng light a Operation gear b Limit switch device c 24Vdc motor d Back up batteries Optional e Release device f Control panel g Terminals of devices h Green Box Optional 2 Installation 3 4 2 3 e h f g a b c d 2 2 Description of Device INSTRUCTIONS PL300E PL400E PL500E PL800E SLIDING GATE OPENER USER MANUAL 3 1 ...

Page 6: ...2 3 Dimension of Device 2 4 Installation of Motor Gear and Gear Rack 100 25 50 25 1 2m 4 INSTRUCTIONS PL300E PL400E PL500E PL800E SLIDING GATE OPENER USER MANUAL ...

Page 7: ...w Step1 Push the lid of release chamber and move rightward Step2 Insert the key and turn counterclockwise to unlock the device Step3 Turn counter clockwise of the bar to release the motor To restore the automation simply reverse the above procedure Step1 Step2 Step3 NO OK DX SX INSTRUCTIONS PL300E PL400E PL500E PL800E SLIDING GATE OPENER USER MANUAL 5 ...

Page 8: ...10 11 PPB 1 PPB 1 PKS 1 PKS 1 SW1 SW3 SW4 SW5 3 4 PF 1 PF 1 AC INPUT 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 AC INPUT 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 6 INSTRUCTIONS PL300E PL400E PL500E PL800E SLIDING GATE OPENER USER MANUAL LED2 LED1 AC INPUT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 C lo s e S to p G N D P b P h P h 2 P h 1 G N D E X T E X T G N D 1 3 7 5 L ig h t O...

Page 9: ...splay is on then wait for LED display off LED display ON 2 Sec LED display blink twice LED display OFF 1 3 114 ON OFF LED2 LED1 Press 1 3 Sec Press 3 Sec Push 1 2 3 4 5 6 1 LED1 LED2 LED3 ON OFF 2 3 4 5 6 7 8 9 10 11 12 13 14 LED1 LED2 LED3 ON OFF Push 3 seconds 1 2 CAUTION Before proceeding to system learning the transmitter memorizing process has to be completed INSTRUCTIONS PL300E PL400E PL500E...

Page 10: ...d full speed The deceleration setting for gate moving Deceleration Speed full speed Over current setting 1 2 3 4 5 6 7 1 1 1 2 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 3 1 3 2 3 3 4 1 4 2 4 3 4 4 5 1 5 2 5 3 5 4 5 5 6 1 6 2 6 3 6 4 6 5 7 1 7 2 7 3 7 4 7 5 7 6 Clockwise Opening Counterclockwise Opening No automatic closing 5 seconds 15 seconds 30 seconds 45 seconds 60 seconds 80 seconds 120 seconds 180 ...

Page 11: ...when the gate starts to move The flashing light blinks 3 seconds before the gate starts to move Stop Reverse 1 second Reverse 3 second Reverse to the end A key B key C key D key No function in transmitter A key B key C key D key No function in transmitter A key B key C key D key Close Open Close Open Close Open Open Stop Close Stop Open Stop Close 1 The function can adjust the time of opening part...

Page 12: ...inues opening Logic F3 1 The reactions of the photocells when detecting obstacles Gate Status Closed Open Stop during moving Closing Opening Safety Edge Stop opening Stop opening closing Reverses to open for 2 seconds Reverses to close for 2 seconds Photocell 1 No effect Reloads automatic closing time Open No effect Reloads automatic closing time Logic F3 2 The reactions of the safety edge photoce...

Page 13: ...on class Dimension Through beam 25 meters 100ms AC DC 12 24V 20 60 IP54 96mm 45mm 43mm 4 1 Techanical Data Sheet Of Series Worm Gear 3500N 3000N 3400RPM 72W 24 Vdc 3A Up to 300 KG 4M 3A for Maximum 10 secs 20o C 50o C 250 170 275mm 7 5kg 24 25 cm s PL300E PL400E Worm Gear 5500N 5000N 3800RPM 144W 24 Vdc 6A Up to 500 KG 6M 5 5A for Maximum 10 secs 20o C 50o C 250 170 275mm 8kg 27 10 cm s Worm Gear ...

Page 14: ...d 4 on the receiver with the terminals Ph GND and Ph1 on the P600B PCB And use an extra wire to connect terminals 2 and 5 on the receiver as a bridge Detection Method Sensing Range Input Voltage Response Time Emitting Element Operation Indicator Dimensions Output Method Current Consumption Max Water Proof Through Beam 25M AC DC 12 24V 100MS IR LED Red LED RX ON When Beam is Broken Green TX ON 96 4...

Page 15: ...earn Button for 1 second the LED light should be ON If the LED does not respond please check the cable connection again c Press and hold Button C on the remote for 1 second after the LED is ON The remote completed the memorizing process when LED light turns OFF 3 Device Testing Remote Memorization a Orange cable Signal 1 connect to terminal 10 Pb on the control board b Blue cable GND connect to te...

Page 16: ...ower saving mode Installation manner AC IN connect the electricity AC OUT connect the power of gate opener and connect the transformer 5V CABLE connect 3 pins white socket of control board Please make sure the switch of Green Box is off before proceeding the system learning and installation of device Wait for the system learning and installation of device to be completed power on the Green Box Gat...

Reviews: