Installation Instructions
NOTE:
Installation should be in accordance with accepted plumbing
practices. Flush all pipes thoroughly before installation. Installation and
field adjustment are the responsibility of the installer.
Installation
n
1. Locate suitable place for the tempering valve. Valves should be accessible
for service and adjustment, and as close to the point of use as possible.
2. Bleed pressure from the system.
3. Route copper tubing or piping to fit valve dimensions.
4. For valves with Quick-Connect tailpieces refer to “Quick-Connect
Installation” instructions below.
5. Remove tailpieces from the valve and make sure union nuts are over
the tubing/piping before connecting to the tailpiece.
NOTE:
If soldering, remove unions and gaskets from valve body prior to
soldering to prevent damage to valve from excessive heat.
6. Flush piping again, install valve using filter gasket on
hot and cold water inlets and fiber gasket on mixed
water outlet.
7. Turn on the cold and hot water. If any leaks are observed,
tighten connections as necessary to stop leak
before proceeding.
HydroGuard
®
Thermostatic Tempering Valves
ASSE 1069 and 1070 Series LM495 and LFLM495
IS-P-LM495
1. Mark pipe as shown.
This is pipe insertion depth.
2. Clean pipe end.
1. Remove collet clip.
2. Depress collet.
3. Pull tubing from tailpiece.
3. If using PEX tubing, insert pipe
stiffener (provided) into end of pipe.
4. Push tubing into tailpiece up to mark.
5. Insert collet clip.
To Connect
To Disconnect
PEX tubing only
Pipe Stiffener
Tail Piece
Mark
Collet clip
Collet depressed
1
1
⁄
2
in. (38.1mm)
1
3
⁄
4
in. (44.45mm)
1
7
⁄
8
in. (47.63mm)
1
⁄
2
in.Pipe (12.7mm)
3
⁄
4
in.Pipe (19.05mm)
1 in.Pipe (25.4mm)
Figure 1.
Typical ASSE 1069 Application
Quick-Connect Installation
n
Cold
Hot
LM495 or
LFLM495
Mixed
LFLM495-1
LM495-5
COLD WATER
SUPPLY
POWERS SERIES LM495 OR
LFLM495 WITH INTEGRAL
CHECKS AND SCREENS
HOT WATER SUPPLY
Figure 2.
Single/Two Handle
Faucet Application
Advanced
Thermal Activation