
Confirm the number of serial numbers is same as number of batteries in the battery
rack.
Cabling
Replace the long RJ45 cable with suitable length RJ45 cable to connect into the top
battery.
Connect the other end to top battery in the rack.
Connect another small RJ45 cable to the remaining port in the same battery.
Connect the other end into next battery
(Daisy chain).
Repeat the daisy chain connection till last battery.
Connect the RJ45 termination connector in the remaining slot on the last battery. (19)
After 1-2 minutes, go to MultiStat (available on the home page). (20)
Verify that all the batteries are responding.
If you are not able to see the battery status in MultiStat window, press Restart polling
button in configuration page and repeat step 19 & 20.
Powerlink Installation and Operation Manual
V 3.3
05/12/2022 Page of
7
8