PowerPlus Energy Powerlink Installation And Operation Manual Download Page 7

Confirm the number of serial numbers is same as number of batteries in the battery 
rack. 

Cabling 

Replace the long RJ45 cable with suitable length RJ45 cable to connect into the top 
battery. 

Connect the other end to top battery in the rack. 

Connect another small RJ45 cable to the remaining port in the same battery. 

Connect the other end into next battery 
(Daisy chain). 

Repeat the daisy chain connection till last battery. 

Connect the RJ45 termination connector in the remaining slot on the last battery. (19) 

After 1-2 minutes, go to MultiStat (available on the home page). (20) 

Verify that all the batteries are responding.  

If you are not able to see the battery status in MultiStat window, press Restart polling 
button in configuration page and repeat step 19 & 20. 

Powerlink Installation and Operation Manual

V 3.3

05/12/2022  Page   of 

7

8

Summary of Contents for Powerlink

Page 1: ...eration Manual Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 1 8 Powerlink 61 3 8797 5557 info powerplus energy com au powerplus energy com au Residential Commercial Industrial Utilities and Telecom ...

Page 2: ...upplied with Powerlink 5 Powerlink module Setup and monitoring procedure 6 Powerlink set up 6 Web interface setup 6 Battery scanning procedure 6 Cabling 7 Request login details for the portal 8 Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 2 8 ...

Page 3: ...batteries have been designed as a stand alone self managed solution however the PowerLink module also provides information via MODBUS with future releases including CANBUS and SNMP options The information provided by the PowerLink module will assist in providing the optimum performance and longevity from your energy storage Speci fi cations Powerlink Installation and Operation Manual V 3 3 05 12 2...

Page 4: ...tallation and Operation Manual V 3 3 05 12 2022 Page of 4 8 40 mm 110 mm 110 mm LAN port USB ports Micro USB Power Port name Port description Audio port unused HDMI port unused RJ45 monitoring port LED indicators LAN port LED indicators ...

Page 5: ...Supplied with Powerlink Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 5 8 2m RJ45 cable 30cm RJ45 cable 5V power supply to micro USB RJ45 termination plug ...

Page 6: ...ill open the home page as shown in the picture Press con fi guration button a screen like the picture will open Press reset data to remove any previous data from the Files enter the Number of Batteries to be scanned into the box and press submit Battery scanning procedure Note battery scanning order should be from top to bottom in the rack with only one battery connected at at time Take the longes...

Page 7: ...ry Connect the other end into next battery Daisy chain Repeat the daisy chain connection till last battery Connect the RJ45 termination connector in the remaining slot on the last battery 19 After 1 2 minutes go to MultiStat available on the home page 20 Verify that all the batteries are responding If you are not able to see the battery status in MultiStat window press Restart polling button in co...

Page 8: ... performance powerplus energy com au 3000 login Customer needs to supply all PowerLink Serial Numbers and Site Name Support will create login and will email details to the customer once complete Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 8 8 61 3 8797 5557 2 Koornang Road Scoresby VIC 3179 PO Box 4407 Knox City Vic 3152 info powerplus energy com au ...

Reviews: