8
2
s t e P
Be careful to assemble all components
in the sequence they are presented.
nOte:
finger tighten all hardware in this step. do not wrench tighten until end of step 3.
A.
Attach Fixing Tube (E) to Middle Connect Tube (A) using:
Two 30 (M10x55 hex head bolt)
Four 50 (
f
10 washer)
Two 40 (M10 nylon lock nut)
Note:
Adjust hole position as necessary according to your body height.
Please check highlighted section in diagram.
B.
Install two Square End Caps (5) onto Adjust Tube (F).
C.
Install Chest Pad (M) onto Adjust Tube (F) using:
Two 32 (M8x40 hex head bolt)
Two 54 (
f
10 spring washer)
Two 51 (
f
8 washer)
D.
Slide Adjust Tube Assembly into Fixing Tube (E) and fix the position using Pop-pin (20).
E.
Install Leg Pad (L) onto Middle Connect Tube (A) using:
Four 33 (M8x20 hex head bolt)
Four 54 (
f
10 spring washer)
Four 51 (
f
8 washer)
Summary of Contents for PGM200X
Page 1: ...PGM200X O w n e r s M a n u a l v 021109...
Page 7: ...1 STEP 7 Above shows Step 1 assembled and completed...
Page 9: ...2 STEP 9 Above shows Step 2 assembled and completed...
Page 11: ...3 STEP 11 Above shows Step 3 assembled and completed...
Page 15: ...15 For POWERLINE Customer Service http www bodysolid com support powerline docs html...
Page 25: ...9 41 ANATOMY CHART 25...
Page 26: ...42 FITNESS GOALS 26...
Page 27: ...8 43 EXERCISE LOG 27...
Page 28: ...8 44 EXERCISE LOG 28...
Page 29: ...8 45 EXERCISE LOG 29...
Page 40: ...Exploded View Diagram PGM200x...
Page 41: ......
Page 42: ......
Page 43: ......