background image

IO PH PR  12/13

For comprehensive installation instructions of the PowerHold

read and understand the Installation and Operation Manual.

PowerHold Installation Overview

POWERPACK LOCATION OPTIONS

POWERHOLD REMOTE MOUNT POWERPACK

Inside Building (Remote Mount)

Locate powerpack to minimize 
obstruction potential. Hydraulic and 
electrical lines from the powerpack 
to the restraint are best placed 
through min. 3” PVC (hydraulic) 
and 3/4” (electrical) chase during pit 
construction.

Under The Dock Leveler 

When combined with hydraulic leveler pump or 
remotely mounting under leveler, make certain 
to locate the powerpack where leveler will not 
interfere in below dock conditions. The routing 
of hydraulic and electrical lines from the 
powerpack to the restraint are best placed 
through min. 3” PVC (hydraulic) and 3/4” 

conduit (electrical) 
chase during pit 

construction.

Allow 
Enough 
Clearance 
for Possible 
Seal or 
Shelter

Dock Face (Self Contained)

Appropriate location when the likelihood of 
flooding, snow removal and damage from 
trailer/trucks is minimal. Also recommended 
for use with non-hydraulically powered dock 
levelers.

Coordinate powerpack location and hose 
length for proper placement.

Reviews: