Power Pub Shed 4x4 Instructions Download Page 3

 

 

 

 

 

 

 

 

1.

 

Screw the two gable extension pieces to each side of the roof overhang and screw the tongue and 
groove boards to the underside of the roof overhang. Please note, the boards may need cutting 
down to size. 

 

 

 

 

 

 

 

 

 

2.

 

To close the pub, the window hatch simply need to be placed into the wall panel from the inside. 
Turn buttons can be used to secure it in position when the pub is closed. 

 

 

 

 

 

 

 

3.

 

The shelving can be added to the front using the shelving instructions in the booklet provided.  
Please do not set the shelving too high as it may block the window hatches.  

 

Note

 - Shelving boards may need cutting down to fit. 

 

Reviews: