TABLE of CONTENTS
SECTION 1:
“SAFETY”
SAFE OPERATION
1-4
SECTION 2:
“ENGINE”
PRE-OPERATION CHECK
1
OPERATING THE ENGINE
2
ENGINE SPECIFICATIONS
3
ENGINE MAINTENANCE SERVICE SCHEDULE
4
ENGINE OIL MAINTENANCE
5
ENGINE COOLANT MAINTENANCE
6
OPERATING HOURS AND SERVICE LOG
7
ENGINE TROUBLESHOOTING GUIDES
8-10
SECTION 3: “GENERATOR
END”
PRINCIPLES OF OPERATION
1-2
“M” SERIES EXCITER TYPE GENERATOR ASSEMBLY __
3
“K” SERIES EXCITER TYPE GENERATOR ASSEMBLY
4
GENERATOR END TROUBLESHOOTING GUIDES
5-7
RESISTANCE CHART
8
WIRING SCHEMATICS
9-13
SECTION 4:
“INSTALLATION”
SAFETY PRECAUTIONS
1-2
GENERATOR INSTALLATION in RECREATIONAL VEHICLES
3-6
SYSTEMS CONNECTION
7-12
ELECTRICAL CONNECTIONS
13-15
ENGINE
CONTROLS_______________________________________________
16-19
WIRING
SCHEMATICS
SECTION 5: “POWER
CONTROL
MODULE”
POWER CONTROL MODULE (PCM) and DISPLAY (PCMD) _____________
1-3
TROUBLESHOOTING GUIDES ______________________________________
4-10
12 VOLT DC POWER CONTROL MODULE WIRING SCHEMATIC _______
11
Summary of Contents for PTS-15
Page 30: ...120 VOLT CONNECTION M SERIES EXCITER TYPE 9...
Page 31: ...120 240 VOLT CONNECTION M SERIES EXCITER TYPE 10...
Page 43: ......
Page 44: ...9...
Page 47: ...12...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 63: ...Power Controller Module PCM And Display PCMD...
Page 74: ...KUBOTA 12Volt DC POWER CONTROL MODULE WIRING SCHEMATIC 11...