Power-Pole Signature Series Installation Manual Download Page 7

Step 2: Mounting the Power-Pole

®

1.  Once the mounting location has been selected, place 

the stern bracket against the transom, and mark the 
mounting holes with a fine point marker. Carefully 
drill pilot holes in each of the four marked locations 
with a 9/64” drill bit. Then, drill out each of the four 
pilot holes with a 5/16” drill bit.

2. Once all of the holes have been drilled, apply a liberal 

amount of marine grade sealant between the stern 
bracket and the hull, as well as around the 5/16” 
holes.

3. With a 1/2” wrench and 1/2” socket, fasten the stern 

bracket to the transom using (4) 5/16” x 3.5” all-
thread transom mount bolts 

A

, (4) 5/16” neo-bond 

washers 

B

, (4) 5/16” fender washers 

C

, and (4) 

5/16” tall brass nuts 

D

. The rubber backed neo-bond 

washers 

B

 will protect the powder coated surface of 

the stern bracket, and they must not be over tightened. 
(See Figure #2) 

Step 3: Hydraulic Pump Unit (HPU)

Choose a mounting location

1. Locate a dry compartment in the vessel with ample 

space to accommodate the HPU. The footprint of the 
HPU is approximately 6.5”x 7”.

Note:

 

Be sure to allow enough clearance 

surrounding the HPU such that the hydraulic 

tubing will not make a severe bend when exiting 

the compartment. Also, allow enough space to 

install the (2) 3/8” x 3/4” bolts 

E

 through the 

mounting bracket and into the HPU.

Step 5: Installing Hydraulic Tubing

1. Guide the blue and black hydraulic tubing through 

the black mesh tubing cover 

M

Note:

 

The black mesh tubing 

M

 cover may need to 

be trimmed to length.

  

WARNING: 

Keep debris out of the hydraulic tubing. 

Use the red end caps provided at all times while 

routing the hydraulic tubing throughout the boat. 

Debris in the tubing will cause damage to the HPU.

Step 5: Continued 

2. At this point, the hydraulic tubing may be routed 

in one of two ways.  It may be routed either over 
the transom or through the transom using the (2) 
supplied thru-hull bushings 

K

. If the hydraulic tubing 

is not being installed through the transom, route 
the tubing to the HPU as per your preference, and 
proceed to Step E. If the hydraulic tubing is to be 
installed through the transom, holes will need to be 
drilled for the thru-hull bushings 

K

Note:

 

When choosing a location for the holes, ensure 

that the tubing will form a natural curve when 

leaving the stern bracket, and that the transom 

holes will be above the water line.

 

3. First, drill pilot holes in the transom with a 9/64” drill 

bit for each of the (2) thru-hull bushings 

K

. Then, 

drill out both pilot holes with an 11/32” drill bit. Once 
the holes are drilled, insert the (2) thru-hull bushings 

K

, and route the tubing to the HPU. (See Figure #4)

Note:

 

Be sure to allow an adequate amount of slack in 

the hydraulic tubing between the stern bracket and 

the point that the tubing enters the vessel. This will 

provide slack in the hydraulic lines to allow for full 

up and down operation.

4. The tubing is now ready to be attached to the HPU. 

Route the tubing according to your preference, and 
trim the excess using a razor tubing cutter. All cuts 
made in the tubing must be as straight as possible to 
ensure that the compression fittings do not leak. 

Note:

 

For ease of future maintenance, leave enough 

excess hydraulic tubing such that the HPU can be 

moved out of the compartment with the tubing still 

attached.

5. While taking note of their orientation, remove the blue 

and black dust caps from the hydraulic compression 
fittings on the HPU. 

6. Disassemble both of the compression fittings by 

removing their nuts and ferrules. With both the 
blue and black hydraulic tubing cut to length, feed 
each through a compression fitting nut as well as a 
compression fitting ferrule. (See Figure #5)

Note:

 

The tubing needs to pass through the ferrule far 

enough such that there is approximately a  

1/2” length of tubing exposed. (See Figure #5)

3. Once the unit has reached the end of its range of 

motion, keep the “down” button depressed for 5 
seconds in order to bleed all residual air from the 
hydraulic tubing. Next, retract the anchor with the 
“up” button. Once again, keep the button depressed 
for 5 seconds in order to bleed all residual air from 
the hydraulic tubing. Repeat this process three times 
in both directions or until satisfactory performance is 
achieved. 

4. The HPU’s hydraulic fluid level may need to be topped-

off after the final priming has been completed.

Step 5: Continued 

7. Insert the blue tubing into the compression fitting 

labeled UP (blue dust cap), and the black tubing 
into the fitting labeled DN (black dust cap). While 
holding the blue tubing fully inserted into its 
respective compression fitting base, begin threading 
the compression fitting nut onto the base. Repeat this 
step for the black tubing. (See Figure #6)

 

Step 4: Continued

6. Unravel the red and black wires on the HPU. Route 

the red wire to a 12 volt positive source via a battery 
switch, and route the black wire to a 12 volt negative 
source via a common ground post.

 Prior to cutting the excess wire, ensure that there is an 

adequate amount of slack such that they may be 

easily disconnected in the future.

7. Once the wires have been trimmed to length with wire 

cutters, install the (2) ring connectors 

J

 using wire 

strippers and wire terminal crimpers. 

8. Heat the (2) ring connectors 

J

 with a heat gun until 

their respective jackets shrink completely and adhere 
to the wires.

 

DO NOT CONNECT the red or black wire at this time. 

These wires will be connected once the hydraulic 

tubing is installed.

8. Tighten both compression fitting nuts with a 9/16” 

wrench while simultaneously holding their respective 
bases with a 1/2” wrench. (See Figure #7)

Warning:

 

The nuts must be tightened down far 

enough such that none of the compression 

fitting’s threads are visible; otherwise, hydraulic 

failure may occur. (See Figure #8)

Step 6: Priming the HPU

1. Now connect the red and black wires from the HPU 

to their respective locations. 

See Step 4.

 Once both 

wires are securely fastened, the green LED on the 
HPU should flash indicating that the unit has power.

2. Use the “down” button on the HPU cover to cycle the 

Power-Pole anchor from the fully retracted position to 
the point where it makes contact with a solid surface. 
(See Figure #9)

A

A

B

B

C

D

Step 4: Installing the HPU

1. Remove the fill cap on the HPU, and fill the reservoir  

to the “full” line with the supplied quart of 
Green Marine

®

 biodegradable hydraulic 

fluid or an ISO 32 hydraulic fluid. 

 

Using anything other than an ISO 32 

hydraulic fluid, such as Green Marine, 

may cause damage to the HPU, and will 

void your warranty.

2. Place the HPU bracket in the 

predetermined area of the vessel, and 
inscribe the four mounting hole locations with a fine 
point marker.

 

Before drilling holes to mount the HPU mounting 

bracket, inspect the area beneath the mounting 

surface to insure that the drill bit will not cause any 
damage.

3. Using a 9/64” drill bit, carefully drill holes in the newly 

inscribed locations.

4. Fasten the bracket to the vessel using a #2 Phillips-

head screwdriver and the (4) #10 x 3/4” pan head 
screws 

H

.

5. Once the bracket is securely fastened, use a 9/16” 

wrench to attach the HPU to its bracket using the (2) 
3/8” x 3/4” bolts 

E

, (2) 3/8” neo-bond washers 

F

and (1) rubber pump gasket 

i

(See Figure #3 and 4)

E

i

F

Figure 2

Figure 4

Figure 5

Figure 6

Figure 7

Figure 8

H

Figure 3.1

Figure 9

Step 8: Programming the HPU/HPUs

In order to utilize the full potential of the Power-Pole 
shallow water anchor, the HPU/HPUs must be assigned 
as either a single, port side, or starboard side unit.  
Follow the “single unit” instructions when installing only 
one anchor, and use the “dual units” instructions when 
installing two anchors. The “dual units” instructions must 
also be used when installing a second unit at a later date.

Note:

 

Assigning a single unit as either a port side 

or starboard side unit will cause adverse  

operating behavior.

SINGLE UNIT
1. Locate the “program” button on the top of the HPU, 

and depress and hold it for 6 seconds until the LED 
steadily illuminates red in color. The LED will initially 
illuminate green (after 3 seconds), but will change 
to red after 6 seconds, thus indicating that the unit is 
ready to be programmed. (See Figure #12)

2. Next, depress and hold both the “up” and the “down” 

buttons on the HPU simultaneously. The LED will flash 
red 3 times indicating that the programming has 
been completed successfully.

Step 7: Pairing the Dash Switch 

and Remote Control

1. Locate the “program” button on the top of the pump 

unit, depress and hold it for 3 seconds until the LED 
steadily illuminates green in color. The pump unit is 
now ready to be paired with the switch. The HPU will 
remain in the pairing mode for 20 seconds. 
(See Figure #10)

Note:

 When dual Power-Pole shallow water anchors 

are installed, this procedure should be performed 
on BOTH pump units.

Step 7: Continued

2. Next, depress and release the button on the remote 

1 time. The green LED on the pump unit will initially 
turn off, and then it will flash steadily indicating that 
the pairing has been completed. (See Figure #11)

3. The surface mount switch is now paired to the pump 

unit. Test its functionality by following the operating 
instructions to ensure that the pairing procedure was 
completed successfully.

4. Repeat the same programming procedure with the 

remote control. (See Figure #10)

Step 8: Continued

DUAL UNITS
1. Using the “up” and “down” buttons on both HPUs, 

determine which HPU controls the port side Power-
Pole anchor and which one controls the starboard 
side. (See Figure #12)

2. With both HPUs identified, begin with the starboard 

side unit. Locate the “program” button on the top of 
the HPU, and depress and hold it for 6 seconds until 
the LED steadily illuminates red in color. The LED will 
initially illuminate green (after 3 seconds), but will 
change to red after 6 seconds, thus indicating that the 
unit is ready to be programmed.  

3. Next, depress and hold the “up” button on the 

starboard side HPU. The LED will flash red 2 times 
indicating that the programming has been completed 
successfully, and the HPU has been assigned as the 
starboard side unit.

4. Repeat the programming procedure with the port side 

HPU, but instead depress and hold the “down” button 
on the HPU. This time the LED will flash red 1 time 
indicating that the programming has been completed 
successfully, and the HPU has been assigned as the 
port side unit.

Figure 10

Figure 11

Figure 12

Summary of Contents for Signature Series

Page 1: ...nature Series Shallow Water Anchor Installation Instructions CAUTION Read this instruction manual carefully Become familiar with the controls and know how to operate the Power Pole shallow water anchor system safely US Pat No 6 041 730 ...

Page 2: ...erformance and dependability for years of enjoyment Please read all installation instructions carefully The information contained here describes the proper procedures for safely installing your Power Pole shallow water anchor CAUTION Do not use the Power Pole shallow water anchor as your primary anchorage Never leave your boat unattended while anchored solely with the Power Pole shallow water anch...

Page 3: ...location on the transom your vessel will require an adapter plate We offer adapter plates to accommodate a wide variety of applications Please contact one of our authorized dealers or a member of our sales staff for an adapter plate recommendation 813 689 9932 option 1 2 All adapter plates are accompanied by installation instructions Refer to the included instructions while installing the adapter ...

Page 4: ...gh clearance surrounding the HPU such that the hydraulic tubing will not make a severe bend when exiting the compartment Also allow enough space to install the 2 3 8 x 3 4 bolts E through the mounting bracket and into the HPU A A B B C D Step 4 Installing the HPU 1 Remove the fill cap on the HPU and fill the reservoir to the full line with the supplied quart of Green Marine biodegradable hydraulic...

Page 5: ...ll up and down operation 4 The tubing is now ready to be attached to the HPU Route the tubing according to your preference and trim the excess using a razor tubing cutter All cuts made in the tubing must be as straight as possible to ensure that the compression fittings do not leak Note For ease of future maintenance leave enough excess hydraulic tubing such that the HPU can be moved out of the co...

Page 6: ... wrench while simultaneously holding their respective bases with a 1 2 wrench See Figure 7 Warning The nuts must be tightened down far enough such that none of the compression fitting s threads are visible otherwise hydraulic failure may occur See Figure 8 Step 6 Priming the HPU 1 Now connect the red and black wires from the HPU to their respective locations See Step 4 Once both wires are securely...

Page 7: ...ly indicating that the pairing has been completed See Figure 11 3 The surface mount switch is now paired to the pump unit Test its functionality by following the operating instructions to ensure that the pairing procedure was completed successfully 4 Repeat the same programming procedure with the remote control See Figure 10 Step 8 Continued DUAL UNITS 1 Using the up and down buttons on both HPUs ...

Page 8: ...ed location use a fine point marker to inscribe the intended mounting screw locations WARNING Before drilling pilot holes for the dash switch mounting screws inspect the area beneath the mounting surface in order to ensure that the drill bit will not cause any damage 5 Using the 7 64 drill bit carefully drill holes in the previously inscribed location 6 Fasten the dash switch base to the vessel us...

Reviews: