USEFUL INFORMATION AND SAFETY STANDARD 
 

FOREWORD 

¾

 

The installation of AURORA must be performed in full compliance with national and local 
standards and regulations  

¾

 

AURORA has no internal user serviceable parts other than fuses. 
For any maintenance or repair please contact the nearest authorized repair center. Please contact 
your reseller if you need to know the nearest authorized repair center. 

¾

 

Read and understand all the instructions contained in this manual and become familiar with the 
safety symbols in the relevant paragraphs before you install and commission the equipment 

¾

 

The connection to the distribution grid must be done only after receiving approval from the 
distribution utility as required by national and state interconnection regulations, and can be done 
only by qualified personnel. 

¾

 

Safety Brake the wind turbine to prevent any possibility of high voltages appearing at the 
connecting cable terminations.

 

¾

 

The AC disconnecting means must be opened before working on the Aurora Wind inverters.

 

 

GENERAL 

During inverter operation, some parts can be powered, some not properly insulated and, in some cases, 
some parts can move or rotate, or some surfaces can be hot.  
Unauthorized removal of the necessary protections, improper use, incorrect installation or incorrect 
operation may lead to serious damage to people and objects. 
All transport, installation and start-up, as well as maintenance operations, shall be carried out by skilled 
and trained personnel (all national regulations on accidents prevention shall be complied with ! ! !). 
According to these basic safety rules, qualified and trained people have skills for the assembling, start-
up and operation of the product, as well as the necessary requirements and qualifications to perform 
such operations.  
 

ASSEMBLY 

Devices shall be assembled and cooled according to the specifications mentioned in the corresponding 
documents. 
In particular, during transport and handling, parts shall not be bent and/or the insulation distances shall 
not be changed. There should be no contact between electronic parts and connection terminals.  
Electrical parts must not be mechanically damaged or destroyed (potential health risk).  
 

ELECTRICAL CONNECTION 

With the inverter powered, comply with all prevailing national regulations on accidents prevention. 
Electrical connections shall be carried out in accordance with the applicable regulations, such as 
conductor sections, fuses, PE connection.  
 

OPERATION 

Systems equipped with inverters shall be provided with further control and protective devices in 
compliance with the corresponding prevailing safety rules, such as those relating to the compliance 
with technical equipment, accident-preventing regulations, etc. Any calibration change shall be made 
using the operational software. Once the inverter has been disconnected from the power grid, powered 
parts and electrical connections shall not be touched as some capacitors could be charged.  
Comply with all corresponding marks and symbols present on each device. During operation, make 
sure that all covers and doors are closed.  

MAINTENANCE AND SERVICE 

Comply with manufacturer’s recommendations.  
 

SAVE ALL DOCUMENTS IN A SAFE PLACE !  
 
 
 
 

Summary of Contents for AURORA PVI-2500-WIND-INTERFACE

Page 1: ...AURORA Wind Box Interface INSTALLATION AND OPERATOR S MANUAL Model numbers PVI 7200 WIND INTERFACE PVI 4000 WIND INTERFACE PVI 2500 WIND INTERFACE Rev 4 0...

Page 2: ...olo Ferrini 16 Apr 2009 Additional Information SAVE THESE INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS PVI 7200 WIND INTERFACE PVI 4000 WIND INTERFACE PVI 2500 WIND INTERFACE available upon request This...

Page 3: ...e paragraphs highlighted by this symbol contain processes and instructions that must be absolutely understood and followed to avoid potential danger to people NOTE the paragraphs highlighted by this s...

Page 4: ...ed and trained personnel all national regulations on accidents prevention shall be complied with According to these basic safety rules qualified and trained people have skills for the assembling start...

Page 5: ...de 10 1 4 5 Grid Fail 10 1 4 6 Wait the wind 10 2 WBI Connections 11 2 1 Required System Connections 11 2 2 Wind Speed Feed back 13 3 WBI Installation and Commissioning 13 3 1 Assembly and Mounting In...

Page 6: ...his function may extend the use of the product with some kind of high voltage turbine The diversion load activation may occur with high winds severe gusts and when the utility grid fails WARNING This...

Page 7: ...utput power 360 600Vdc PVI 7200 W I 200 600Vdc PVI 4000 W I Operating ambient temperature 25 C to 55 C 13 F to 140 F Enclosure type Nema 4X Relative Humidity 0 100 condensing Audible Noise 40dBA Size...

Page 8: ...llation and Operator s Manual Page 8 of 20 Aurora Wind Interface Rev 4 0 1 2 WBI Block Diagram The AURORA WBI is designed to be used with the Aurora Wind Inverter Figure 1 Wind Box Interface Block Dia...

Page 9: ...tem block diagram The wind turbine must have a primary safety means of limiting the wind turbine speed this typically is a some type of furling method blade stalling self limiting airfoil design elect...

Page 10: ...he utility interconnection checks and is connected to the utility grid The inverter is exporting power to the utility grid and following the power curve of the wind generator 1 4 4 Export Diversion Mo...

Page 11: ...for all other non US versions I O Connection Required Knock out Trade Size US Glander others Wind Speed Optional PG 9 3 8 M16 Wind Input Yes PG 16 3 4 M32 Diversion Load Optional PG 16 1 2 M25 Bulk O...

Page 12: ...Installation and Operator s Manual Page 12 of 20 Aurora Wind Interface Rev 4 0 Figure 4 Glanders designations for standard version non US...

Page 13: ...k of fire and shock connect Output DC terminals prior to the connection of Input AC terminals Disconnect devices shall be provided in the end use installation on the AC side Input source shall have a...

Page 14: ...The WBI must be mounted at least 1m 3 feet above floor level on a vertical surface 3 1 2 Minimum clearances The WBI needs to be mounted with the following minimum clearances around itself Top 20 cm 40...

Page 15: ...the Aurora Wind Inverter Connect the Bulk Out terminal to the IN 1 terminal in the Aurora wind inverter Connect the Bulk Out terminal to the IN 1 terminal in the Aurora wind inverter Verify that the...

Page 16: ...us LED 3 6 3 Aurora Wind Inverter The Aurora Wind Inverter is a grid connected only inverter A connection to a grid is required for operation The Aurora Wind Inverter will connect to the grid and expo...

Page 17: ...iversion LED status High wind speeds Diversion load is active No proper power curve is uploaded W s slope is to be optimized Wind turbine stalls Wind Input Vac 40 Vac Diversion LED status Diversion Lo...

Page 18: ...Installation and Operator s Manual Page 18 of 20 Aurora Wind Interface Rev 4 0...

Page 19: ...Installation and Operator s Manual Page 19 of 20 Aurora Wind Interface Rev 4 0...

Page 20: ...Installation and Operator s Manual Page 20 of 20 Aurora Wind Interface Rev 4 0...

Reviews: