Figure 61. Transfer Key KB to
Key Lock K1 and Rotate
Figure 63. Verify the Control Selector
Switch is in the OFF Position
Figure 64. Connect the Umbilical Cord of the
Remote Operating Station to the
Ground and Test Device
Figure 65. Move the Control Selector
Switch to the CLOSE Position
Figure 62. Key KB is Captive and
Key KU is available
26. Transfer key KC to key lock K3 and rotate (Figure
86). Pull the Racking Access Interlock handle
fully. Install the racking handle, and rotate the
handle counter clockwise to move the ground and
test device into the DISCONNECT position. The
disconnect position is indicated on the position
indicator. Remove the racking handle.
27. Push the Racking Access Interlock handle fully.
Rotate key KC to lock the ground and test device
in the DISCONNECT position. Key KC is now
available (no figure provided).
28. Transfer key KC to key lock K2 and rotate (Figure
87). Key KC is captive and key KB is available.
29. Transfer key KB to key lock K1 and rotate (Figure
88). Key KB is captive and key KU is available.
30. Remove the ground and test device from the
compartment (no figure provided).
31. Remove key KU from key lock K1 (Figure 89).
32. Secure key KU in the Con Edison lock box.