Pottery Barn Seville Series Mounting Instructions Download Page 2

 
 

Seville Medicine Cabinet Lrg Esp 

Page 

2

 of 

3

 

 

MOUNT WALL RAIL TO THE WALL 

1.  Find wall studs and determine the desired placement on the wall for the product. Position the wall rail (C) on the 

wall and adjust so that the rail is level. It is better to mount the wall rail to at least (1) stud. Then, use a felt-tipped 

pen to mark the wall through the three pre-drilled holes of the rail to indicate the locations of the drywall toggles. 

2.  Drill the holes at the marked places on the wall. Then Use a manual screwdriver, drive two toggle (b) into the 

drywall at the marks on the left and right.  To install these toggles (b) into the wall, simply rotate them at the marked 

location as if they were a large screw, applying smooth even force.  DO NOT HIT THEM WITH A HAMMER AND 

DO NOT USE A POWER DRILL TO ROTATE THEM.  These toggles are designed to bore themselves into the wall.  

Continue rotating until the toggle head advances flush with the wall surface. See 

Figure 1

 

3.  Once the toggles (b) are installed into the wall at the marked locations, reposition the wall rail (C) so that the 

marked holes of the rail align with the toggles.  Using the supplied toggle screw (c) secure the rail (C) to the 

installed toggles (b).  Note: Tighten toggle screw flush with item, the screw pops open the Toggle, this reinforces 

the wall and increasing its holding power significantly. 

4.  Screw the wood screw (d) into the wall through the middle hole of wall rail. 

 

 

Figure 1 

 

5. 

HANG THE PRODUCT ONTO THE MOUNTED WALL BRACKET

 

1.  On the back of your product is one affixed product-mounting bracket. 

Figure 2

2.  Carefully position the product-mounting bracket slightly above and against the wall rail, insuring that the two 

rails are aligned.  Engage the two rails. 

Reviews: