6.0 Legislation
9
© Baxi Heating UK Ltd 2008
6.1
Installation, Commissioning, Service & Repair
1. This appliance must be install in accordance with the
manufacturer’s instructions and the regulations in force.
Read the instructions fully before installing or using the
appliance.
2. In GB, this must be carried out by a competent person
as stated in the Gas Safety (Installation & Use)
Regulations.
3.
Definition of competence:
A person who works for a
CORGI registered company and holding current
certificates in the relevant ACS modules, is deemed
competent.
4. IN IE (Eire), this must be carried out by a competent
person as stated in I.S. 813 “Domestic Gas Installations”.
All CORGI registered installers carry a CORGI
identification card and have a registration number. You
can check your installer is registered by telephoning
0800 915 0485 or writing to:-
1 Elmwood,
Chineham Park,
Crockford Lane,
Basingstoke. RG24 8WG.
or check online at www.trustcorgi.com
The boiler meets the requirements of Statutory
Instrument “The Boiler (Efficiency) Regulations 1993 No
3083” and is deemed to meet the requirements of
Directive 92/42/EEC on the energy efficiency
requirements for new hot water boilers fired with liquid
or gaseous fuels:-
Type test for purpose of Regulation 5 certified by:
Notified Body 0085.
Product/Production certified by:
Notified Bodies 0086.
For GB/IE only.
6.2
Benchmark Commissioning Checklist
1. Please ensure that your installer hands you the boiler
Installation & Service Instructions with the “Benchmark
Commissioning Checklist sections completed. The
details in the Checklist will be required in the event of
any warranty work. Keep the instructions in a safe place
and ensure that the Service Interval Record at the back
is completed at each service visit.