6. Wiring of NGP-300D
Wire the NGP-300D. All wiring should be performed by a licensed
electrician and conform to NEC and all applicable local standards.
For wiring instructions refer to the Wiring Diagram on page 34.
Wiring location is in the nitrogen cabinet. See Figure 6.
6.
Install ½” NPT pipe (or larger) from the Air
Maintenance Device (AMD) to the sprinkler system using
standard accepted installation practices. Additional
system components may be required. See Figure 5.
NOTE:
AMD shown in closed
position.
Figure 5