POP UP EIGER 250 Assembly Manual Download Page 3

MOVING A TOWER

If you need to move the tower to a new location or a new level, fully dismantle it an 
rebuild it at the new location.
If moving the tower a small distance, remove all personnel, materials, tools and 
everything else from the tower.
If the stabilisers can remain in position, reduce the tower to an overall height of 
4m before moving. Raise the stabiliser’s legs so that the footpads are approximately 

If the stabilisers need to be removed or repositioned (i.e. swung in to allow access 
to a doorway) you must reduce the tower to a platform height of 2m. With help, 
unlock all castors, move the tower, then re-lock the castors and vertically align the 
tower using the adjustable legs ready for rebuilding to the required height.

ing the base.

STABILISERS

When using the tower against a wall, they may be positioned in 
must be at least two thirds the height of the top working platform. When locating 
stabilisers on the towers, maximum stability will be achieved by positioning at an 
angle of 60 degrees. Extend the leg to achieve maximum leg extension and ensure 
that the top coupler is positioned underneath the nearest horizontal frame tube.
Securely lock the top coupler before attaching the lower arm to the vertical frame 
tube. Ensure that the rubber foot pad is in contact with the ground and that the 
ground can support the weight of the tower and stabilisers.

GETTING STARTED

The Eiger 250 tower is available in two base sizes, 850mm by a 1.8m or 2.5m 
platform length. The tower will be supplied with various height frames and you 

wing instructions deal 

with a tower using 4 rung frames at the start, if supplied with 6 rung frames instead 
of 4 rung, start with the 6 rung frames.
Where you have both 4 rung and 6 rung, you must use the 4 rung 
6 rung next, with (where applicable) 8 rung frames at the top. 
needs to be carefully positioned to ensure that the remaining tower is constructed 

latform height you are 

erecting.
The access tower requires a minimum of two persons to assemble it, do not 
attempt to assemble the tower on your own.

f a tower. If your 

risk assessment shows it necessary, you may also need to guardrail platforms at 
this level.

EIGER 250 SAFE QUICK AGR

 ASSEMBLY GUIDE

SINGLE WIDTH 850 TOWER 4.2M PLATFORM HEIGHT

4.7

5.2
5.7
6.2
6.7
7.2
7.7
8.2
8.7
9.2
9.7

10.2
10.7

11.2
11.7

12.2

PLATFORM REPOSITIONING TABLE

2

4
6
8

2

4
6
8

2

4
6
8

2

4
6
8

10

12

14
16
10

12

14
16
10

12

14
16
10

12

14
16

18

20

22
24

18

20

22
24

18

20

22
24

18

20

22
24

26
28
30
32
26
28
30
32

226

28
30
32

34
36
38

40

34
36
38

40

42

44
46
48

Tower 

Platform 

Height

Swap 

Platform 

(Rung)

Platform 1 

(Rung)

Platform 2 

(Rung)

Platform 3 

(Rung)

Platform 4 

(Rung)

Platform 5 

(Rung)

BUILD PROCESS

STEP 1

Insert castor / adjustable leg 
assemblies into base of two 4 rung 
frames, allowing approximately 
75mm of extended leg for levelling.

mechanism to lock the castors.

STEP 2

Fit a horizontal brace onto the vertical 
frame tube of the 4 rung frame, 
resting on the horizontal tube of the 
second rung of the frame.
Ensure the brace trigger faces to the 
outside of the tower.

STEP 3

ensuring brace hook again rests on the 
second rung of the frame. Fit the second 
horizontal brace as shown with hook 
trigger facing downwards. Level around 
base of tower using spirit level, making 
adjustments as necessary to adjustable 
legs until the frames have an inclination 
no more than 1% from the vertical.

STEP 4

the hook to one side of the second 
horizontal brace as shown.

STEP 5

Locate AGR panels on frames. Position 
top hooks of AGR panels on horizontal 
tubes of the twelth rung of the frames 
before attempting to locate the 
triggered hooks.
Ensure lower hooks are positively locked 
onto the horizontal rungs and the AGR 
lower horizontal tubes are inline with
the vertical tubes of the frames.

25mm off the ground.

Stabilisers shall always be fitted where specified, these increase the stability as a 

free standing structure. Best effect is obtained from the stabilisers when they 

are arranged as shown in fig. 1

fig.1

fig.2

60

0

60

0

WALL