STEP 4
Top Tube
Board Tube
Cross Tube
Cross Bolt
Washer
Nut
1
2
6
27
29
x2
x2
x1
x2
x4
x2
ID# Name
Qty.
30
29
30
27
29
6
1
1
2
2
Repeat on other side
Board Tube
Base Tube
Connector Tube
Bolt
Washer
Nut
2
3
5
25
29
x2
x2
x1
x4
x8
x4
ID# Name
Qty.
30
Repeat on this side
3
3
2
2
29
25
30
29
5
www.popashot.net
7
PAGE
STEP 3
Repeat on other side
Start at the lowest
Spring Lock position
and raise it up as
needed. Choose your
height based on your
space and the height
of your players.
Note: After height is set,
push the black collar down
on top of the (#2) Board
Tube to cover the transition.