C – General Information
OMM.C.P.AA.00
C‐
7
June
2018
Attention! Equipment Clearances!
Proper clearances should be maintained for adequate airflow and heat rejection! Generally, up to 36” side and
96” top clearances are required. For more information on clearances as well as equipment dimensions and other
details, refer to the submittal documentation.
Pic. C.4