8.12
9850068 R01 - 2020-2021
RZR
PRO XP / XP 4 Service Manual
© Copyright Polaris Industries Inc.
FRONT DRIVE SHAFT INSTALLATION
1. Install
new
spring ring
q
on drive shaft. Apply an
anti-seize compound to the splines
w
.
2. Align splines of drive shaft with front gearcase and
reinstall the drive shaft.
3. Install drive shaft into the front bearing carrier.
4. Install the upper and lower ball joint ends into the
front bearing carrier.
5. Install
new
pinch bolts and nuts
e
. Torque to
specification.
TORQUE
Ball Joint Fasteners:
44 ft-lbs (60 Nm)
6. Install front wheel hub assembly
r
,
new
cone
washer
t
, and hand tighten the
new
castle nut.
Install washer with domed side out.
7. Torque wheel hub nut
y
to specification and install a
new
cotter pin
u
. Tighten nut slightly if necessary to
align cotter pin holes. Bend both ends of cotter pin
around end of spindle in different directions.
TORQUE
Wheel Hub Castle Nut:
180 ft-lbs (244 Nm)
8. Install
new
brake caliper mounting bolts and torque to
specification.
TORQUE
Front Caliper Mounting Bolts:
33 ft-lbs (45 Nm)
CAUTION
New bolts have a pre-applied locking agent which is
destroyed upon removal. Always use new brake caliper
mounting bolts upon assembly.
Summary of Contents for RZR PRO XP 2020
Page 3: ...REVISION INDEX REV DATE CHANGES R01 11 10 2020 Initial Release...
Page 6: ......
Page 587: ...Symptom and Occurrence Checklist BEEN PRESENT SINCE NEW 51...
Page 588: ......
Page 590: ......