4.13
ENGINE / CARBURETOR / CLUTCH
4
7. Remove cables from harness guide clips (J).
8. Disconnect the stop switch (K).
9. Remove the inner tie rod bolts (L).
10. Remove steering post fasteners (M).
11. Remove the steering post.
12. Find master link on drive chain. Remove keeper and slide
master link out. Do not re-use master link. Always replace
with new. Remove the chain.
13. Hold shoulder of clutch with adjustable pliers and remove
clutch bolt. Slide clutch off drive shaft.
14. Free recoil rope from chassis. Be sure to tie knot in rope
upon removal from handle or rope will retract inside recoil
housing.
15. Remove fuel line from fuel tank to carburetor. Have
container or shop cloth ready to catch any spilled fuel.
16. Remove eight (8) motor mount bolts (N). Four are located
at the base of the engine and protrude through bottom of
bulkhead. The other four are located on clutch side of
bulkhead as shown.
17. Remove engine by tilting engine toward PTO side and
sliding engine to MAG side. Lift engine out.
J
K
L
M
N
Summary of Contents for 2000 120 XCR
Page 1: ...BAR CODE 9920517 Cover_9920517 5 11 06 12 32 PM Page 1 ...
Page 25: ...2 10 GENERAL ...
Page 26: ...2 11 GENERAL 2 ...
Page 27: ...2 12 GENERAL ...
Page 29: ...3 2 MAINTENANCE TRANSPORTING TOWING 3 12 TRANSPORTING 3 12 TOWING 3 12 ...
Page 44: ...4 5 ENGINE CARBURETOR CLUTCH 4 CLEARANCE DATA LIMITS CYLINDER HEAD ...
Page 45: ...4 6 ENGINE CARBURETOR CLUTCH CYLINDER PISTON Out of Round Cylinder Taper ...
Page 46: ...4 7 ENGINE CARBURETOR CLUTCH 4 ...
Page 47: ...4 8 ENGINE CARBURETOR CLUTCH CONNECTING ROD ...
Page 48: ...4 9 ENGINE CARBURETOR CLUTCH 4 CAM SHAFT VALVES ...
Page 49: ...4 10 ENGINE CARBURETOR CLUTCH 45q seat ...
Page 58: ...4 19 ENGINE CARBURETOR CLUTCH 4 ENGINE COMPONENT LOCATIONS ...
Page 89: ...NOTES SUSPENSION 6 8 ...
Page 94: ...7 5 ELECTRICAL 7 120 WIRING DIAGRAM ...
Page 95: ...NOTES ELECTRICAL 7 6 ...
Page 99: ...IX 4 ...