Instruction manual
W-536
4/6
III. Packing and transport
Each element is vacuum packed in foil:
IV. Preparing for first use
The landing area elements are vacuum packed only for transport. Please unpack them immediately after delivery and
leave them in a roofed place for few hours, so that they can return to their original shapes.
Storing vacuum packed
landing area elements may cause permanent damages in their internal structures.
When the landing area elements
return to their original dimensions, you can place them in high jump field. The field surface should be even, smooth
and without any obstacles. If you use the landing area outdoors, you should also provide: a special waterproof cover
P-536 to protect the landing area against unfavourable weather conditions and a modular platform SW-5x3 to insulate
the landing area from the ground.
V. Assembly
It is done in 5 easy steps:
Packages’ dimensions
[m]
contents
segment I
segment II
top pad
total
length L
2,50
2,50
1,70
width B
1,00
1,00
1,20
height H
1,00
1,00
1,20
Volume [ m
3
]
2,50
2,50
2,45
7,45
Gross weight [kg]
78,00
78,00
45,50
201,50
place the main segments of the landing area in the high
jump facility,
using the jacquard webbing belts and self-locking
buckles located on the segment sides fasten the
segments to each other,
place the top pad on the landing area main segments,
then fasten the top pad to the main segments using the
snap hooks and D-rings,
now the landing area is ready for use.