Polanik W-536-S Technical Specification Instruction Manual Download Page 5

 

Technical specification / Instruction manual 

W-536-S 

III. Preparing for first use 
 
The landing area elements are vacuum packed only for transport. Please unpack them immediately after delivery and 
leave  them  in  a roofed  place  for  few  hours,  so  that  they can  return  to  their  original  shapes. 

Storing  vacuum packed 

landing area elements may cause permanent damages in their internal structures. 

When the landing area elements 

return to their original dimensions, you can place them in high jump field. The field surface should be even, smooth and 
without any obstacles.  
 
 
IV. Assembly 
 
It is done in 4 easy steps:  
 

 

 

 

place the first pad of mattresses assurance, two 
of type A and one of type B 

          

 

 

then fasten the pads with the clamping belts, 

 

When the pads of first layer are connected, 
then placed next layer, but started of the pad 
type B 

 

Finished layers of pads covered the PCV cover 
with spike resistant surface if the training take 
place in shoes with spikes or smooth surface if 
you use normal footwear and also to protect 
cover from the rain 

 
 

Summary of Contents for W-536-S

Page 1: ...TECHNICAL SPECIFICATION INSTRUCTION MANUAL High jump school landing area W 536 S File 2016 06 13 PRODUCT SUPPORT Pawel Ciechanowski p ciechanowski polanik com ...

Page 2: ...ed sports personnel In no event shall Polanik Sp z o o be liable for any special incidental indirect or consequential damages in connection with the purchase or use of POLANIK products or costs over the original cost of the product Specific warranty terms 1 The use of the landing area outdoors requires a waterproof cover and a landing area platform for proper insulation from the ground Failure to ...

Page 3: ...tion manual W 536 S 3 I General description POLANIK landing area W 435 is top quality sports equipment which is designed to secure jumpers and absorb impact energy of a jumper s landing after take off and flight in high jump training ...

Page 4: ...ster with two vinyl layers Net weight kg 150 kg Mattresses assurance components of landing Type A B Type by norm PN EN 12503 1 4 4 Quantity pcs 4 2 Dimensions length width height m 3 2 0 25 3 1 0 25 Net weight kg 27 13 5 Internal structure PUR foam Covering PCV made of polyester with two vinyl layers with mesh ventilation Underside Anti slip properties Carrying handles very strong jacquard webbing...

Page 5: ...lements return to their original dimensions you can place them in high jump field The field surface should be even smooth and without any obstacles IV Assembly It is done in 4 easy steps place the first pad of mattresses assurance two of type A and one of type B then fasten the pads with the clamping belts When the pads of first layer are connected then placed next layer but started of the pad typ...

Page 6: ...nding area from the ground VI Maintenance Due to the hygiene requirements it is recommended that the landing area should be cleaned regularly with commonly available detergents Before you start wiping the landing area please try to clean a small spot on its bottom side in order to check the reaction with the PVC fabric VII Storing The landing area segments can be stored only in a horizontal positi...

Page 7: ...e following documents Document No Title Edition Date of issue Position PN EN 12503 2 Sports mats Part 2 Pole vault and high jump mats safety requirements April 2004 All above Additional Information 5 Declaration for BUYER and USER Signed for and in behalf of POLANIK 2016 06 13 Piotrkow Tryb Date and place of issue Pawel Ciechanowski Product Manager 6 Name function Signature or equivalent authorize...

Reviews: