background image

 

Tech. specification and instruction manual                                       PP-171 /6d 

                        8 / 9 

Counterweight 

Hurdle foot 

Foot catch bolt 

Spring 

Foot plastic plug 

Bolt M6 

f) 

slide out the counterweight carefully 

 pay attention to the stainless steel bearing balls installed in the bottom of 

the counterweight 

 they  may fall out 

, and remove the bolt M6, 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

g) take out the balls from their sockets, 
 

 

 

 
h) the counterweight, the ball sockets and the inside of the foot tube should be cleaned from dirt and old grease, 
i) grease the inside of the ball sockets and install the balls,  
j) slide in the counterweight carefully, 
j) the assembly process is done in the reverse sequence. 

 
 

 
 
 
 
 

Summary of Contents for PP-171/6d

Page 1: ...TECHNICAL SPECIFICATION INSTRUCTION MANUAL Competition steel aluminium collapsible hurdle PP 171 6d File 2019 02 26 PRODUCT SUPPORT Pawel Ciechanowski p ciechanowski polanik com ...

Page 2: ...d instruction manual PP 171 6d 2 9 I General description and use PP 171 6d is a resistant to weather inexpensive in transport and high quality competition hurdle which is designed for national and international competitions ...

Page 3: ...lapsible certified A Top board plastic with inside ribbing B Telescope tube aluminium anodized or powder painted in red spring loaded button system of height adjustment C Frame steel galvanized D Feet aluminium anodized or powder painted in red spring loaded button system of counterweight selection counterweights installed on stainless steel balls Heights mm 650 762 838 914 991 1067 Weight kg 13 A...

Page 4: ...s in parts frames feet and foot screws separately and wrapped with foil IV Parts list part sets Item Part set description Q ty pcs Sketch 1 Hurdle frame 1 2 Hurdle foot 2 3 Washer 2 4 Foot screw 2 Package type foiled pallet Dim cm contents 18 pcs length 120 width 80 height 100 Volume m3 0 96 Gross weight kg 260 ...

Page 5: ...he socket if it is not straight please correct its position c screw the foot item 2 to the hurdle frame item 1 by means of the foot screw item 4 and the washer item3 d install the other foot in the same way The main goal of the hurdle collapsible construction is to assure easy and cheap transport Note that once you screw the feet down the hurdle is practically non dismountable Therefore we do not ...

Page 6: ...ress and hold the knob in the hurdle foot d then slide the counterweight to the corresponding height according to the label then release the knob do the same with the other hurdle foot During idle periods the hurdles must be stored in a roofed dry place For optimal performance they should be stored and transported on Polanik hurdle carts HC 23 and HC 34 After every athletics season the hurdles mus...

Page 7: ...ly is done as follows a push down the foot catch and slide it toward the plastic plug b put hex key into the bolt M6 through the technological hole under the foot c hold the foot catch bolt with wrench 19 and unscrew the bolt M6 with the hex key d remove the foot catch bolt and the spring from the counterweight e remove the foot plastic plug from the foot tube it often happens that the plug is dam...

Page 8: ... bearing balls installed in the bottom of the counterweight they may fall out and remove the bolt M6 g take out the balls from their sockets h the counterweight the ball sockets and the inside of the foot tube should be cleaned from dirt and old grease i grease the inside of the ball sockets and install the balls j slide in the counterweight carefully j the assembly process is done in the reverse ...

Page 9: ...Tech specification and instruction manual PP 171 6d 9 9 VII IAAF Certificate ...

Reviews: