Instruction manual
KLD17-5/7-A
11/21
VI. Net hoisting
When the pillars are screwed bottom net tension cable (item 9) ought to be mounted, see the diagram below.
a
–
extreme pillar ~7 m, item 3
b
–
central pillar ~7 m, item 2
c
–
standard pillar, item 4
d
–
bottom net tension steel cable, item 9
e
–
extreme anchor, item 5
Unscrew the adjusting nut until 1 cm of threads
remains.
Remove the clamp from the other end of the steel
rope.
Thread the rope end through the loops of the
embedded anchors starting from the extreme anchor,
use its lower loop
Then reinstall the clamp, pull the rope end to tighten
it preliminarily.