background image

6

©

PODAB 2012

Step 1: Put the tumble dryer in place

Remove the packaging. When installing the appliance, take note 
of its dimensions and the space requirement for the connection 
of an exhaust air duct. Also make sure that there is enough room 
in front of the dryer for the door to be opened fully.

NOTE: We recommend that the machine is installed on a firm 
and level floor.

Step 2: Installation without plinth

If the tumble dryer is to be installed directly on a conctrete floor 
(or on a conctrete plinth) PODAB recommends the following 
work flow:   

• 

Place the dryer on the desired installation spot.

• 

Mark the holes for the fastening brackets (accessorie, article 
number 210008).  The fastening brackets should secure one 
foot at the front and one at the back (diagonally placed). The 
brackets prevent the machine from tipping.

• 

Drill and place drilling plugs in the holes.

• 

Place the dryer and align the appliance with the help of a 
spirit level all sides. If necessary, correct the height of the  
tumble dryer feet.

• 

Fasten the choosen feet with the brackets and tighten the 
screws fixating the brackets to the floor.

For installation on an steel plinth follow the instructions includ-
ed with the plinth (accessorie, article number 101212).  

Step 3: Connect the tumble dryer to the 

ventilation channel

For further instructions, se page 7: Requirements for ventila-
tion.

• 

Do not use ventilation channels made of plastic or foil.

• 

Place the dryer so that the ventilation channel is as short as 
possible.

• 

Make sure that the ventilation channel is cleaned when a new 
dryer is installed.

• 

Use a 125 mm rigid or flexible metal duct to the evacuation 
connection.

• 

If you use rigid ducts, it is important that the male connector 
of the ventilation tube on each section follows the air direc-
tion.

• 

The construction shall be as straight as possible.

• 

Always isolate ducts that go through non-isolated areas. The 
condensation leaves dust and dirt get stuck in the channel.

NOTE: If the dryer is not connected according to these rec-
ommendations, the warranty is no longer valid. 

Installation guide

 

Step 4: Connect the tumble dryer to the 

main switch

To prevent fire and electrical shock, the dryer MUST be con-
nected according to the color codes on the cables. Only an 
authorized electrician is allowed to install the electrical connec-
tion. The dryer is prepared for one of the following electrical 
connections depending on specification:

• 

400 V, 3-N, 50 Hz (standard)

• 

220 V, 3-N, 50 Hz

• 

440 V, 3-N, 50 Hz

NOTE: Only an authorized electrician should carry out the  
electrical connection.  

Step 5: Control that the heating relay is 

working

Shut the door and start the dryer, after about 3 seconds you 
can hear the heating relay hit. Wait a couple of minutes and 
control that the outgoing air channel becomes warm.

If the outgoing air channel does not get warm, go back to step 
4 and control that the electrical connection is installed correctly.

WARNING

It is the customers responsibility to check that an authorized 
electrician install the electrical connections.

To prevent personal injuries, the dryer shall always be con-
nected permanently through an all pole main switch. Always
ground the appliance. Also check that the connecting cable 
has a strain relief bushing. If not, there is a risk that the dryer 
will be live.

Summary of Contents for T 201 E

Page 1: ...Tumble dryer T 201 E Installation and operation manual...

Page 2: ...AFETY the information in this manual must be followed to prevent property damage and personal injury NOTE The paragraphs marked WARNING and CAUTION appearing in this manual are not meant to cover all...

Page 3: ...e ventilation channel Step 4 Connect the tumble dryer to the main switch Step 5 Control that the heating relay is working Requirements for ventilation 7 Ventilation channel choice of material Requirem...

Page 4: ...stop work ing Please contact your nearest service partner if you are unsure of the dryer s status 11 If the electrical cable is damaged it must immediately be changed by a person with electrical auth...

Page 5: ...haust mm 100 Electrical connection 3 N 400 V 50 Hz Heating effect kW 4 5 Total effect kW 6 3 Energy consumption kg kWh 0 41 Fuse A 10 Article number 121053 Drying of 10 kg cotton dry weight washed and...

Page 6: ...a new dryer is installed Use a 125 mm rigid or flexible metal duct to the evacuation connection If you use rigid ducts it is important that the male connector of the ventilation tube on each section f...

Page 7: ...istance Factors that give a low pressure fall Smooth inner walls on the pipe Large diameter on the pipe Short length on the pipe Few curves Few angels 90 degrees Evacuated amount of air and pressure f...

Page 8: ...ng program During cool down the clothes are reconditioned and the dryer is cooled down A running program can be fast for ward to cool down using the P button Automatic programs The drying cabinet is e...

Page 9: ...ty before start ing to work with the dryer Inspect with set intervals the complete ventilation channel don t forget the outer wall There can easily be leafs and other rubbish that chokes We recommend...

Page 10: ...10 PODAB 2012 Notes...

Page 11: ...11 PODAB 2012...

Page 12: ...gen 9 436 33 Askim SWEDEN Tel 46 0 31 752 01 00 Fax 46 0 31 752 01 50 E mail sales podab se www podab com PODAB 2012 09 11 SERVICE SUPPORT Phone 46 31 752 01 00 Fax 46 31 752 01 50 E mail parts podab...

Reviews: